CERC Sticks To The Letter In PGCIL Tiff With Renew Power Updated On Tue, Jul 27th, 2021 by Saurenergy The Central Electricity Regulatory Commission (CERC) has stuck to the letter of the law, rather than going with the spirit perhaps, in a ruling involving wind developers and a power grid corporation. Renew Power Private Limited obtained Stage-II connectivity for 300 MW at 220 kV Hiriyur sub-station, on the basis of National Thermal Power Corporation […] Read more