UP Adds 100 MW Solar As Tata Power Renewables Commissions Two Projects Updated On Tue, Jan 18th, 2022 by Saurenergy Tata Power Renewable Energy Limited (TPREL), a 100% subsidiary of Tata Power has confirmed commissioning of two Solar Power projects of 50 MW each at Prayagraj, and Banda in Uttar Pradesh. The landmark projects have been completed by TPREL within the agreed timelines inspite of Covid challenges. The plants are expected to generate more than […] Read more
SJVN Awarded LoI for 125MW Solar Projects in Uttar Pradesh Updated On Tue, Jan 11th, 2022 by Saurenergy SJVN Ltd advanced 2.81% to Rs 31.05 after the company bagged 125 MW grid connected solar power project in UP Solar Park in Uttar Pradesh, according to recent media reports. The company has been issued Letter of Intent (LoI) by the Uttar Pradesh New and Renewable Energy Development Agency (UPNEDA) for building 75 MW grid […] Read more
UP is at a Crossroads in its Electricity Transition: IEEFA-Ember Report Updated On Mon, Dec 20th, 2021 by Saurenergy Uttar Pradesh (UP) has fallen behind other power-intensive Indian states in terms of delivering on renewable capacity targets due to several delays, inducing anxiety in electricity developers. A new joint report by the Institute for Energy Economics and Financial Analysis (IEEFA) and energy think tank Ember says urgent action is needed to get back on […] Read more
PM Modi to Lay Foundation Stone of 600 MW Solar Park in Jhansi, UP Updated On Thu, Nov 18th, 2021 by Saurenergy Prime Minister Narendra Modi will lay the foundation stone of a 600 MW solar power park in Uttar Pradesh’s Bundelkhand on Friday as part of his visit to Mahoba and Jhansi districts to launch multiple development projects worth over Rs 6250 crore which are aimed at alleviating issues of water shortage for farmers in the region. […] Read more
UPNEDA Invites Bids for Empanelment for 38 MW Rooftop Solar Plants Updated On Wed, Nov 17th, 2021 by Saurenergy The Uttar Pradesh New & Renewable Development Agency (UPNEDA) has invited e-bids from eligible vendors interested in being empanelled for the design, supply, erection, testing and commissioning, including warranty and comprehensive operation & maintenance, of 38 MW of grid-connected rooftop solar plants for residential consumers under CAPEX model for a period of five years in Uttar Pradesh. […] Read more
MYSUN Receives 140 MW Solar Order from UPPTCL Updated On Wed, Oct 13th, 2021 by Saurenergy Rooftop solar firm MYSUN has bagged 140-megawatt (MW) open-access solar power projects from the Uttar Pradesh Power Transmission Corp Ltd (UPPTCL), according to a company statement. “MYSUN, has been allocated 140-MW solar projects under the captive/open access mode by the Uttar Pradesh Power Transmission Corporation Ltd (UPPTCL),” the company said in a statement. The allocation […] Read more
NHPC Invites Bids for 45 MW Solar EPC Project in UP Updated On Tue, Sep 14th, 2021 by Saurenergy NHPC Limited has invited bids for the engineering, procurement, and construction (EPC) of a 45 MW grid-connected solar power plant in Uttar Pradesh. Along with associated power evacuation equipment, the project also includes operation and maintenance support for a period of five years from the commissioning of the PV plant. The project, which NHPC has tendered on […] Read more
Omega Seiki To Invest Rs. 100 Crore for EV Manufacturing Unit in UP Updated On Mon, Aug 2nd, 2021 by Saurenergy A member of the Anglian Omega Group, Omega Seiki Mobility (OSM), has signed a Memorandum of Understanding (MoU) with Youth Rural Entrepreneur Foundation (YREF) to set up an electric vehicle (EV) manufacturing facility in Ghazipur, Uttar Pradesh. The Indian OEM has also announced to invest Rs 100 crore for the EV manufacturing unit in the […] Read more
President Kovind’s Childhood Home in Rural UP Goes Solar Updated On Mon, Jul 12th, 2021 by Saurenergy President Ram Nath Kovind’s residence ‘Milan Kendra’ in his native village of Paraunkh, Uttar Pradesh, has now become solarised, a move that should boost awareness about the rooftop solar industry in the region and beyond. Located 70 km away from Kanpur, the President’s childhood home is now powered by a 5 kW solar plant, which […] Read more