Renewables Contribute Only 4% To NTPC’s Turnover in FY24 Updated On Mon, Sep 2nd, 2024 by Saurenergy According to the latest numbers from India’s power giant NTPC, renewable energy assets contribute a mere 1.23% to the company’s turnover. When hydro projects are included, this figure increases to just 4%. NTPC Limited’s Business Responsibility and Sustainability Report indicates that power generation accounts for 94.19% of the company’s total turnover. The report reveals that […] Read more
NTPC Issues 1.2 GW Hybrid Tender With 600 MW Greenshoe Option Updated On Fri, Aug 30th, 2024 by Saurenergy NTPC has released a tender to select hybrid power generators for the supply of 1.2 GW of power from inter-state (ISTS)-connected wind-solar hybrid power projects anywhere in India. This project has a greenshoe option for an additional capacity of up to 600 MW on a Build-Own-Operate (BOO) basis with 20th of September set as the […] Read more
NTPC Awards JSW Neo 300 MW Of Hybrid Power Projects Updated On Fri, Aug 23rd, 2024 by Saurenergy JSW Neo Energy Limited (JSW Neo), a subsidiary of JSW Energy Limited, received a Letter of Award (LoA) for a 300 MW ISTS-connected Wind-Solar Hybrid Power Project from NTPC Limited. JSW Neo Energy got this project against a tariff-based competitive bid and was invited to set up 1,000 MW ISTS-connected Wind-Solar Hybrid Power Projects (NTPC-Tranche-VI). […] Read more
NGEL Invites Bids For Sale Of 100,000 Carbon Credits From RE Project Updated On Mon, Aug 19th, 2024 by Saurenergy NTPC Green Energy Limited, a subsidiary of NTPC, has opened bids through a tendering process followed by a forward auction for the “sale of 100,000 carbon credits (VERs) from RE Projects (Wind and Solar) of NTPC Green Energy Limited registered under the VCS (Verified Carbon Standard) Program.” The tender document states, “The sale of carbon […] Read more
NTPC Achieves 76 GW Capacity, Adds 4 GW In FY24 Updated On Tue, Jul 30th, 2024 by Saurenergy NTPC, at its annual investor’s meeting, announced it has attained a 76 GW installed capacity by June end, of 2024. The company added 4 GW of capacity in FY24, with 21 GW currently under construction and 26 GW under planning. The latest addition was the completion of a small but prestigious 40 MW project at […] Read more
Juniper Secures 480 MW Hybrid PPAs From GUVNL And NTPC Updated On Wed, Jul 10th, 2024 by Saurenergy Juniper Green Energy signed two Power Purchase Agreements (PPAs) for hybrid renewable energy projects with a total capacity of 480 MW. These PPAs were signed with two companies namely GUVNL and NTPC. The company said, “GUVNL Hybrid Phase 1 of the project marks the first hybrid initiative with Gujarat Urja Vikas Nigam Limited (GUVNL), featuring […] Read more
NTPC-REL Launches Tender For 1200 MW Hybrid Project Across India Updated On Mon, Jul 1st, 2024 by Saurenergy National Thermal Power Corporation Renewable Energy (NTPC-REL), has released a tender, inviting bids for the selection of hybrid power generators on Build Own Operate basis. This project is undertaken to supply 1200 MW of power from ISTS-Connected wind-solar hybrid power projects anywhere in India. the last date for submitting bids is August 7, 2024. The […] Read more
NTPC-VVN Invites Bids For 250 MW/500MWh Standalone BESS Project Updated On Fri, Jun 21st, 2024 by Saurenergy NTPC Vidyut Vyapar Nigam Limited (NTPC-VVN), a Central Public Center Enterprise released a tender inviting bids for setting up 250 MW/500MWh Standalone Battery Energy Storage Systems (BESS) in India. NTPC VVN invited bids for the selection of battery energy storage system (BESS) developers for setting up 500 MWh (250 MW x 2 hrs) standalone Battery […] Read more
NTPC Issues Tender For 600kw/3000kwhr Vanadium BESS Updated On Wed, Jun 19th, 2024 by Saurenergy NTPC Limited has now issued a tender seeking parties for 600Kw/3000Kwhr Vandium Redox Flow Battery (VRFB) Storage System. The Central Public Sector Enterprise (CPSE) issued the tender for its NTPC Energy Technology Research Alliance (NETRA) center. The tender mandates the bidders to supply, commission and integrate the BESS for the NTPC’s NETRA power needs. The […] Read more