Haryana Government Issues 10 MW Grid-Connected Solar Plant Tender Updated On Tue, Aug 23rd, 2022 by Saurenergy Haryana Government has invited bids for the supply of 10.4 MWp of Grid-Connected Rooftop (GCRT) SPV Power Plants without a battery storage system or with LiFePO4 Battery Bank. The last date and time of submission of the tender is September 02, 2022, till 2:00 pm, and the bid will be opened on the same day […] Read more
Haryana Tenders for 10.4 MW Grid Connected Rooftop Solar Plant Updated On Fri, Jun 4th, 2021 by Saurenergy The deadline for the Government of Haryana’s tender for supply, installation, and commissioning of a 10.4 MW grid-connected rooftop solar power plant anywhere in the state is approaching next month. The rooftop solar plants should be without the battery bank or with a LiFePO4 battery bank only including solar generation and Bi-directional meters. The scope […] Read more