10.4 MW rooftop solar plant

Haryana Government Issues 10 MW Grid-Connected Solar Plant Tender

Haryana Government has invited bids for the supply of 10.4 MWp of Grid-Connected Rooftop (GCRT) SPV Power Plants without a battery storage system or with LiFePO4 Battery Bank.  The last date and time of submission of the tender is September 02, 2022, till 2:00 pm, and the bid will be opened on the same day […]

Read more

Haryana Tenders for 10.4 MW Grid Connected Rooftop Solar Plant

The deadline for the Government of Haryana’s tender for supply, installation, and commissioning of a 10.4 MW grid-connected rooftop solar power plant anywhere in the state is approaching next month. The rooftop solar plants should be without the battery bank or with a LiFePO4 battery bank only including solar generation and Bi-directional meters. The scope […]

Read more
      SUBSCRIBE NEWS LETTER
Scroll