Vestas Secured 1 GW of order in Australia During 2018 By Ankur/ Updated On Mon, Dec 31st, 2018 The 1 GW of orders is Vestas’ highest in one year since installing the country’s first commercial-sized wind farm 25 years ago. Vestas’ orders in Australia in 2018 have passed 1 GW today after the signing of a 184 MW engineering, procurement and construction contract for the Warradarge Wind Farm. The 1 GW of orders is Vestas’ highest in one year since installing the country’s first commercial-sized wind farm 25 years ago. The project announced today also marks an expansion of Vestas’ footprint in Western Australia, increasing the company’s total installed capacity in the state to 561 MW. Located near Eneabba in mid-west Western Australia, the Warradarge Wind Farm project will feature 51 V136-3.45 MW turbines delivered in 3.6 MW Power Optimised Mode with hub heights of 84 meters to maximise performance in the site’s specific wind conditions. The order is placed by Bright Energy Investments, a joint venture between Western Australian electricity generator and retailer Synergy, global infrastructure investment fund DIF and Australian industry superannuation fund Cbus. “We are extremely pleased to work with Bright Energy Investments on this project. It has extraordinary wind conditions and will make an important contribution to powering Western Australia with competitive renewable energy”, said Asia Pacific President Clive Turton. He further added that, “After the Warradarge Wind Farm comes online, Vestas will have an installed base of 561 MW in Western Australia, expanding our service footprint and capability to support future projects in the state.” “The high calibre of the parties involved in Bright Energy Investments and Vestas’ world-class experience will ensure that the Warradarge Wind Farm is delivered smoothly and on-schedule,” said Tom Frood, General Manager Bight Energy Investments. Tags: Australia, International, Renewable Energy, Vestas, wind energy