Vestas Partners with LM Wind Power for V172-7.2 MW Wind Turbine Blades By Saur News Bureau/ Updated On Thu, Sep 22nd, 2022 Highlights : The agreement signed between the two companies includes designing and manufacturing of blades for V172-7.2 MW wind turbines of the EnVentus platform. The new agreement is a continuation of the existing Vestas and LM Wind Power partnership to manufacture V150 blades in Brazil Vestas Bags 1,220 MW Capacity Orders for Wind Turbines from Europe & US Danish manufacturer, seller, installer, and servicer of wind turbines, Vestas has announced that it has signed an agreement with LM Wind Power – a leading manufacturer of wind turbine blades in Denmark – to develop the wind energy supply chain and scale renewables efficiently for the global energy transition. Within the agreement includes designing and manufacturing of blades for V172-7.2 MW wind turbines of the EnVentus platform. Tommy Rahbek Nielsen, Executive VP & COO, Vestas, informed, “We aim to leverage LM Wind Power’s proven and extensive engineering and manufacturing capabilities coupled with their global footprint to support our customers with high-quality sustainable energy solutions meeting all Vestas standards.” Vestas said that LM Wind Power will work with it throughout the blade development phase to optimise the blade design, the manufacturing setup and supply globally based on Vestas’ specifications and requirements. LM Wind Power will begin the production in the second half of 2024. Vestas V236-15.0 MW Turbine Nacelle Ready For Testing at Lindo, Denmark Also Read As per the official statement, the new agreement is a continuation of the existing Vestas and LM Wind Power partnership to manufacture V150 blades in Brazil. Vestas held that sharing manufacturing operations across the renewables industry is more relevant than ever to ensure sites are not sitting idle and creates a flexible, scalable and efficient supply chain that enables industrial scale to meet global net-zero ambitions. Dorte Kamper, VP Sales & Marketing, LM Wind Power, stated, “Our teams are collaborating on the design and the global roll-out, leveraging our world-class engineering and manufacturing capabilities. Building on decades of experience in delivering high quality and sustainable blades to the global wind industry, we look forward to continuously contributing to the energy transition in partnership with Vestas.” Vestas introduced the V172-7.2 MW wind turbine with global applicability in April, 2022. The EnVentus platform now includes four different wind turbine variants, and since the launch of the EnVentus platform in 2019, Vestas has secured orders for more than 6 GW across 15 different markets on four continents. Vestas Joins 9GW Floating Wind Farm Development in South Korea Also Read Vestas has installed more than 157 GW of wind turbines in 88 countries and it claims that this is more wind power installation than any other player in the world. Tags: Dorte Kamper, EnVentus platform, LM Wind Power, Renewable Energy, sustainable energy, Tommy Rahbek Nielsen, V150 blades, V172-7.2 MW wind turbines, Vestas, wind turbine blades