Suzlon Wins Repeat Order from Juniper for 50.4 MW Capacity By Saur News Bureau/ Updated On Fri, Oct 27th, 2023 Highlights : Suzlon will install 16 wind turbine generators (WTGs) with a Hybrid Lattice Tubular (HLT) tower of their new product with a rated capacity of 3.15 MW each. The project is located at Dwarka district in Gujarat and is expected to be commissioned in 2025. Suzlon's S144 – 3 MW Wind Turbine Series Gets RLMM Enlisting Renewable energy solutions provider Suzlon has secured a new order for 50.4 MW for their 3 MW series turbines. The order has come from Juniper Green Energy Private Limited. Suzlon will install 16 wind turbine generators (WTGs) with a Hybrid Lattice Tubular (HLT) tower of their new product with a rated capacity of 3.15 MW each. The project is located at Dwarka district in Gujarat and is expected to be commissioned in 2025. This is a repeat order from Juniper for the firm’s largest turbine rated 3.15 MW, S144‐140m from the 3 MW series. As part of the agreement, Suzlon will supply the wind turbines (equipment supply) and execute the project including, erection and commissioning. Suzlon will also provide comprehensive operations and maintenance services post‐ commissioning. Wind Turbine Manufacturer Senvion Adds 121.5 MW Order to Portfolio Also Read JP Chalasani, Chief Executive Officer, Suzlon Group, said, “We are delighted to announce our second order with Juniper Green Energy Private Limited in a short period of time for our 3 MW series. Juniper Green Energy is a committed renewable energy independent power producer (IPP) player in India with a comprehensive wind, solar and hybrid power projects. We are honored that they have partnered with us again for their wind energy project. The electricity from this project will serve the people of Gujarat, helping us deepen our contribution to the state.” Back in May, Suzlon Group had revealed that it had secured an order for the 3 MW product series aimed at the development of a 69.3 MW wind power project for Juniper Green Energy Private Limited. This project is also located at Surendra Nagar district in Gujarat and is expected to be commissioned in 2024. The Group boasts a service portfolio of over 14 GW of wind energy assets and has 6 GW of installed capacity outside India. Envision Strengthens Success Story in India with 653.4 MW Order Also Read Tags: Juniper, Suzlon, Wind Energy Assets