SECI Seeking Owners Engineer For Andhra Pradesh Hybrid Project

SECI Seeking Owners Engineer For Andhra Pradesh Hybrid Project Vibrant Energy, Saint-Gobain Sign PPA for Round-the-Clock Renewable Energy

The last date of submission of the EoI is March 25, 2019.

Owners Engineer Andhra Pradesh Hybrid Project

The Solar Energy Corporation of India (SECI) has issued an Expression of Interest (EOI) for the selection of owners engineer for the 160 MW solar-wind hybrid power plant with Battery Energy Storage System (BESS) at Ramagiri, Anantapur District, Andhra Pradesh.

The selection of owners engineer is required during the Design, Engineering, Supply, Construction, Erection, Testing & Commissioning phase of the hybrid power plant in Andhra Pradesh.

The consulting services will include the services of the Engineer to provide support in line with Design, Supply & Installation (DSI) contract documents to SECI during the detailed design review for overall project, supervision of supply, construction, erection, testing and commissioning as well as supervision of the initial operations of the project for 01 year.

The estimated duration of this consultancy/OE services to SECI is for a total period of 30 months which primarily includes the project commissioning timelines of 18 Months plus 12 months of the first year Project operations. SECI may decide to continue with the services of OE after one year of stabilised operations subject to satisfactory performance and terms and conditions and scope of services to be mutually agreed either through an extension of the contract or through a new contract. 

The shortlisting criteria are:

1. The consultant must have experience of having successfully completed similar works in last seven Financial years as on the last date of EOI submission.

2. The consultant must have experience of having successfully completed one similar work costing not less than Rs 2.5 crore in the last seven financial years as on the last date of EOI submission.

3. Minimum Average Annual Turnover (MAAT) of the consultant in the last three financial years should be Rs 1.2 crore.

The last date of submission of the EoI is March 25, 2019. (amended on March 15)

SECI has applied for financing from the World Bank towards the cost of the Project; Innovations in Solar Power & Hybrid Technologies, and intends to apply part of the proceeds for this consulting services.

For more information click here

"Want to be featured here or have news to share? Write to info[at]saurenergy.com

Ayush Verma

Ayush is a staff writer at saurenergy.com and writes on renewable energy with a special focus on solar and wind. Prior to this, as an engineering graduate trying to find his niche in the energy journalism segment, he worked as a correspondent for iamrenew.com.

      SUBSCRIBE NEWS LETTER
Scroll