SECI Extends Deadline for Manufacturing-Linked Tender, Again

SECI Extends Deadline for Manufacturing-Linked Tender, Again

SECI has extended the bid submission deadline for the 7 GW manufacturing linked solar tender.

SECI Deadline Manufacturing Tender

The Solar Energy Corporation of India (SECI) has issued a notification extending the bid submission deadline for the 7 GW manufacturing linked solar tender, yet again.

In its latest amendment, the agency has extended the deadline for the tender from October 31, 2019, to November 8, 2019. The techno-commercial bids will now be opened on the same date i.e. November 8, 2019.

Recently, SECI had issued an amendment for its manufacturing linked solar tender, increasing the capacity of projects to be awarded under the tender from 6 GW to 7 GW. With that change, the new tender is seeking developers for setting up of 7 GW of ISTS-connected solar PV projects linked with 2 GW (annual) of solar manufacturing component.

As per the amendments, the new RfS will feature a higher ceiling tariff that will be payable to the project developers. Increasing the maximum tariff payable to the solar developer to Rs 2.93 from Rs 2.75/ kWh. Perhaps, as a move to invite more active participation from the industry leaders who have so far been vary of the risks involved.

Other Key Amendments:

  • SECI will provide a “green-shoe option” to the successful bidders or developers equivalent to the capacity won by them. To avail the green-shoe option, the successful bidders need to match the lowest tariff of the respective bidding packages.
  • The developers will be provided PPAs for up to 2,000 MW capacity against 500 MW of solar manufacturing component under Bidding Package-A and up to 1,500 MW against 500 MW of solar manufacturing projects under Bidding Package-B.
  • The developers would be allowed to set up ISTS-connected solar projects in parallel with setting up of the manufacturing facility.
  • The solar PV power projects will be allowed staggered commissioning over a period of five years under Bidding Package-A and four years under Bidding Package-B

Earlier, the agency had extended the bid submission deadline on the tender for the umpteenth time. Extending the deadline for bid submission from October 11, 2019, to October 31, 2019.

"Want to be featured here or have news to share? Write to info[at]saurenergy.com

Ayush Verma

Ayush is a staff writer at saurenergy.com and writes on renewable energy with a special focus on solar and wind. Prior to this, as an engineering graduate trying to find his niche in the energy journalism segment, he worked as a correspondent for iamrenew.com.

      SUBSCRIBE NEWS LETTER
Scroll