SCCL Issues Tender for 67.5 MW Ground Based Solar PV Plant By Saur News Bureau/ Updated On Thu, Sep 28th, 2023 Highlights : The bidder should have experience in EPC execution of ground mounted solar projects on turnkey basis including design, supply (supply of modules & inverters can be inclusive or exclusive in the bidder’s scope in the past experience), installation & commissioning of at least one grid connected solar PV power plant Project having an individual capacity of 16 MW or above. SCCL Issues Tender for 67.5 MW Ground Based Solar PV Plant Singareni Collieries Company Limited (SCCL) has issued a tender for design, engineering, supply, construction, erection, testing and commissioning of 67.5 MW (AC) ground based solar PV power plant along with 10 years plant O&M at SCCL. The last date for submission of bids to SCCL is September 29, 2023. The bidder shall submit an EMD of INR. 1,00,00,000. Singareni to Install 13 New Solar Power Plants of 240 MW Capacity Also Read Technical Qualification As per the mandate of the SCCL, the bidder should have experience in EPC execution of ground mounted solar projects on turnkey basis including design, supply (supply of modules and Inverters can be inclusive or exclusive in the bidder’s scope in the past experience), installation and commissioning of grid connected solar PV power plant of capacity not less than 34 (Thirty Four) MW of 132 KV evacuation voltage in last seven financial years as on last date of bid submission. However, such grid connected solar PV power plant capacity must have been in satisfactory operation for at least six (06) months prior to the last date of bid submission. Out of the above, the bidder should have experience in EPC execution of ground mounted solar projects on turnkey basis including design, supply (supply of modules & inverters can be inclusive or exclusive in the bidder’s scope in the past experience), installation & commissioning of at least one grid connected solar PV power plant Project having an individual capacity of 16 MW or above of 132 KV evacuation voltage in last seven financial years as on last date of bid submission. However, such grid connected solar PV power plant capacity must have been in satisfactory operation for at least six months prior to the last date of bid submission. Financial Eligibility The Minimum Average Annual Turnover (MAAT) of the bidder in the last three financial years should be INR Rs.132,00,00,000. The net worth for the last audited financial year should be positive. Tags: 67.5 MW, 67.5 MW Ground Based Solar PV Plant, SCCL