POWERGRID To Evacuate 18 GW Power From Gujarat, Rajasthan Plants By Akash Dhiman/ Updated On Fri, Apr 19th, 2024 Highlights : POWERGRID, has announced that it has won the contracts to establish three inter-state transmission systems (ISTS) projects on a build, own, operate, and transfer (BOOT) basis to evacuate 18 GW of power. POWERGRID To Evacuate 18 GW Power From Gujarat, Rajasthan Plants Power Grid Corporation of India, POWERGRID, has announced that it has won the contracts to establish three inter-state transmission systems (ISTS) projects on a build, own, operate, and transfer (BOOT) basis to evacuate 18 GW of power from several plants based in Rajasthan & Gujarat. These projects include a Transmission System for the evacuation of power from Rajasthan REZ Phase IV along with the establishment of a new 765/400/220 kV pooling substation at Mandsaur in Madhya Pradesh along with the installation of a 765 kV D/C transmission line and associated bay extension works at other existing substations, according to Powergrid. Another project involves augmentation works at existing substations to facilitate the evacuation of power from the potential renewable energy zone in the Khavda area under Phase IV. The scheduled commercial operation date of the projects is 24 months from the date of the letters of intent. The developer must guarantee that every aspect of the project, encompassing equipment, facilities, components, and systems, is planned, built, and tested by the specifications detailed in the transmission service agreement, said Powergrid. Recently, NTPC Renewable Energy Limited (REL) a wholly owned subsidiary of NTPC Limited invited bids for the balance of the system package of a 500MW state transmission utility (STU) connected solar PV project in Bhadla, Rajasthan. Last year, Power Grid Corporation of India Limited acquired two Project Special Purpose Vehicles (SPVs) namely- Ramgarh II Transmission Limited and Beawar Dausa Transmission Limited for the Transmission System Projects. Recently, NLC India Limited, a Navratna Central Public Sector Enterprise (CPSE) under the Ministry of Coal, recently began constructing a 300 MW solar power project at Barsingsar in the Bikaner district of Rajasthan. This project forms part of the Ministry of New & Renewable Energy’s Central Public Sector Enterprise (CPSE) Scheme Renewable PPA Prices In North America Stabilise in Q1, Drop In Europe Also Read Tags: Bhadla, BOOT, Gujarat, Khavda, powergrid, Solar Power