Polysilicon Market Bleeds Top 4 Chinese Manufacturers With Losses In H1 Updated On Wed, Sep 4th, 2024 by Saurenergy German polysilicon market specialist Bernreuter Research reports that the top 4 Chinese polysilicon manufacturers all slipped into losses in the first half of 2024. Consequently, at least three of the top 4 have cut down on capacity utilisation in the second half of the year, even as Tongwei continues to maintain output. In the first […] Read more
IEX’s August Power Market Update Updated On Wed, Sep 4th, 2024 by Saurenergy The Indian Energy Exchange (IEX), the dominant power exchange in the country, has released its market update for August. IEX achieved a total volume (including certificates) of 12,040 MU in August 2024, marking a 35.8% year-over-year increase. The electricity volume at 9,914 MU, increased 17.1% YoY. The renewable energy certificates (REC) at 2,116 MU, increased […] Read more
Green Stocks Sept 3: Suzlon Energy Stock Prices Up Updated On Tue, Sep 3rd, 2024 by Saurenergy On a day when Indian solar cell and solar module manufacturer Premier Energies entered the stock market, most of the green companies reported positive growth. The highest growth was seen by Suzlon Energy which reported a growth of 0.96%. Company name Closing Price On Sept 2 Closing Price on Sept 3 Change % Borosil Renewables […] Read more
MERC Declines MSEDCL’s Plea To Not Allow Virtual Net Meters Updated On Tue, Sep 3rd, 2024 by Saurenergy The Maharashtra Electricity Regulatory Commission (MERC) in its latest notification decided to stick to its plan to roll out the facility of virtual net-metering for residential consumers especially living in multi-storeyed buildings. The state power regulator in its discussion on a draft regulation on the issue ruled out the pleas of the Maharashtra discom and […] Read more
Oriana Power Secures 52 MW Solar Projects From BPCL Updated On Tue, Sep 3rd, 2024 by Saurenergy Oriana Power Limited announced a new order for a 52 MW solar project worth Rs. 247.88 crore from Bharat Petroleum Corporation Limited (BPSCL). As per the new order, Oriana Power will execute a ground-mounted solar power project with a total capacity of 52 MW. The project will be carried out under the EPC (Engineering, Procurement, […] Read more
PM-KUSUM: JREDA Awards Contract To Solartive For Solar Pumps Updated On Tue, Sep 3rd, 2024 by Saurenergy Jharkhand Renewable Energy Development Agency (JREDA) has awarded the contract of solar pumps under the PM KUSUM scheme to Solartive, a water and infrastructure company, the firm said today. Under the project, the company will provide farmers solar pumps with an aim to decarbonise irrigation activities on the farmlands. This project, valued at approximately Rs […] Read more
Can Solhyd’s Hydrogen Solar Panel Become Next Promising Tech? Updated On Tue, Sep 3rd, 2024 by Saurenergy What if we could produce hydrogen using PV solar panels? Sounds unbelievable, right? Two bioscience engineers from the University of Leuven in Belgium claim to have developed a solar panel that can generate hydrogen using sunlight. According to their startup, Solhyd, these hydrogen panels produce hydrogen by capturing water from the ambient air. The startup […] Read more
H1 Results: Trinasolar Ships 34 GW Solar Modules Globally Updated On Tue, Sep 3rd, 2024 by Saurenergy Global solar module manufacturing company Trinasolar has now published its financial report for the first half (H1) of 2024-25. The company reported a revenue of $6.047 billion and net profit attributable to the parent of $74.058 million during this period, the firm said. The green Chinese company said that over the six months, the company […] Read more
PM KUSUM: UPNEDA Issues Bids To Solarise 10,000 Solar Pumps Updated On Mon, Sep 2nd, 2024 by Saurenergy Intending to solarize 10,000 grid-connected agriculture pumps under KUSUM Component C-1, the Uttar Pradesh New and Renewable Energy Development Agency (UPNEDA) recently released a tender. The tender aims to supply, install, test, and commission distributed grid-connected solar PV systems with 5 years of comprehensive maintenance. UPNEDA has set 23rd September as the last date for […] Read more