MoP New Rule Aims To Bring Transparency In Electricity Distribution Updated On Tue, Oct 29th, 2024 by Saurenergy The Ministry of Power (MoP) recently introduced reforms to electricity and distribution regulations aimed at enhancing system transparency through the new Electricity Distribution (Accounts and Additional Disclosure) Rules, 2024. MoP through its latest provision aims to bring claims or sums recovered through tariff order as recoverable, thereby to be included as revenue in the financial […] Read more
Adani Green Optimistic To Add 6 GW RE Capacities In FY25 Updated On Tue, Oct 29th, 2024 by Saurenergy Notwithstanding the interruptions in pace of renewable project installations, triggered by delayed monsoons, Adani Green is optimistic about its target of adding 6 GW of operational capacity in FY25. In its latest investors call, the top management of the firm expressed optimism on its growth trajectory for the current fiscal. The company said that it […] Read more
India Can Turn To Global South For Its Critical Minerals Needs: IEEFA Updated On Tue, Oct 29th, 2024 by Saurenergy India’s minerals are at risk due to high import dependency and reliance on a few countries. Currently, India depends on resources such as synthetic and natural graphite, lithium oxide, nickel oxide, nickel sulphate, and copper cathodes. The study highlights the need for a diversified procurement strategy for these minerals to reduce trade risks. These minerals […] Read more
ALMM: India’s Enlisted Module Production Capacity Crossed 60 GW Updated On Tue, Oct 29th, 2024 by Saurenergy The Ministry of New and Renewable Energy (MNRE) today issued the fresh Approved List For Models and Manufacturers (ALMM) for the solar module makers. The latest list saw a surge in the enlisted production capacity of Indian solar module manufacturers. With the inclusion of the new enlisted capacities, India’s cumulative enlisted domestic module manufacturing capacity […] Read more
APTEL Rules Against Transferability of Banked Energy Updated On Tue, Oct 29th, 2024 by Saurenergy In an order last week, the Appellate Tribunal for Electricity (APTEL) delivered a key judgement on the transfer of banked wind energy between two projects belonging to the same firm. The case was filed by steel maker Maharashtra Seamless Limited versus the Maharashtra Electricity Regulatory Commission, Maharashtra State Electricity Distribution Co. Ltd., Maharashtra Energy Development […] Read more
Powerica Wins 50 MW Wind Energy Project From SECI Updated On Tue, Oct 29th, 2024 by Saurenergy The Solar Energy Corporation of India (SECI) recently announced power generation company Powerica as the winner of its 50 MW auction out of the total 500 MW wind project. The company secured the project at a tariff rate of ₹3.81 per unit. The initial tender was intended for a 500 MW project. However, SECI has […] Read more
Jinko Solar launches Tiger Neo 3.0 Solar Panels Updated On Tue, Oct 29th, 2024 by Saurenergy Global solar module manufacturer Jinko Solar has announced the launch of its Next Generation TOPCon Technology solar panels, Tiger Neo 3.0. The company claimed the product delivers the world’s most powerful modules of up to 670 W and the solar industry’s first-ever 495W residential modules. Built on JinkoSolar’s patented N-type TOPCon technology, including HCP, MAX, etc., […] Read more
COP29 At Azerbaijan- Sungrow Steps Up To Back Green Transition Updated On Tue, Oct 29th, 2024 by Saurenergy With the world’s attention set for the events at COP29, starting November 11 in Azerbaijan, it has become an important time to track the changes in the host country itself. In line with the country’s commitment to diversify its economy and reduce greenhouse gas emissions, Azerbaijan aims to increase its installed power capacity from renewable […] Read more
PPA of 15 years Among Key Changes Proposed in TBCB Norms By India’s Power Ministry Updated On Tue, Oct 29th, 2024 by Saurenergy In Draft guidelines for Tariff based competitive bidding involving solar, wind, Hybrid, FDRE and Energy storage projects, India’s Ministry of Power has come out with a slew of proposed changes. The draft document has been released for feedback and suggestions, with a last day of submissions being 15 days from publishing of the guidelines, ie, […] Read more