CERC Denies Granting ‘Change Of Law’ Benefits To Adani Green Updated On Mon, Nov 6th, 2023 by Saurenergy The Central Electricity Regulatory Commission (CERC), in its latest judgment, declined to give relief to Adani Green on ‘Change of Law’ events on procedural issues. It came after Adani Green, who was a respondent in a petition filed by the Solar Energy Corporation of India (SECI). The Petition was related to the adoption of tariffs. The Petition […] Read more
NTPC REL Achieves Commercial Operation of First Wind Project of 50 MW Updated On Mon, Nov 6th, 2023 by Saurenergy NTPC Renewable Energy Limited, a wholly owned subsidiary of NTPC, has announced the commercial operation of its wind first project. The said project is for a capacity of 50 MW at Dayapar in Kachch, Gujarat. With the commissioning of this project, the cumulative installed capacity of NTPC Group has become 73,874 MW while the total […] Read more
Altigreen & Bolt.Earth Sets Sights on Deployment of 100 3.3 kW Charging Stations Updated On Fri, Nov 3rd, 2023 by Saurenergy Altigreen, which manufactures electric vehicles designed for last-mile applications, has entered into an agreement with Bolt.Earth, a firm which provides electric vehicle charging infrastructure. The two firms have together set sights on the deployment of a hundred 3.3 kW charging stations for electric three-wheelers within a month. Further, they intend to set up more than […] Read more
US May See 619 GW Of Renewable Power Between 2023-2030: Report Updated On Fri, Nov 3rd, 2023 by Saurenergy A latest report from BloombergNEF forecast a staggering 619 gigawatts (GW) of solar, wind and storage to come online between 2023 and 2030 in the United States. The report forecasts that this will raise energy capacity by 19 GW from the previous outlook. While structural constraints, such as permitting and grid connections, and a higher […] Read more
RPO Target for 2022-23 to Continue in Absence of Clear Target for 2023-24: WBERC Updated On Fri, Nov 3rd, 2023 by Saurenergy While most States have specified Renewable Purchase Obligation (RPO) targets for 2023 to 2024, West Bengal has not mentioned its RPO goal for said time period. The absence of a clear RPO target for the year 2023-2024 has been challenged before the WBERC (West Bengal Electricity Regulation Commission). The WBERC had last specified the RPO […] Read more
India Launches Programme For Energy Efficient Cooking Updated On Fri, Nov 3rd, 2023 by Saurenergy Energy Efficiency Services Limited (EESL), a joint venture of Public Sector Undertakings under the Ministry of Power, launched its National Efficient Cooking Programme (NECP) and Energy Efficient Fans Programme (EEFP) under the presence of Union Minister for Power and New and Renewable Energy RK Singh, at an event held in New Delhi. These initiatives are […] Read more
Cosmic Aims To Tap Offshore Market To Offer OEM Services: Shravan Gupta, Cosmic PV Power Updated On Fri, Nov 3rd, 2023 by Saurenergy How has the journey of Cosmic been in the last two years? In the last two years, our journey was quite fascinating. We are growing at a 100 percent growth rate. The growth rate was even higher when the Approved List of Module Manufacturing (ALMM) provisions were in place which safeguarded the interests of Indian […] Read more
SJVN Calls Bids for 1500 MW ISTS Connected Solar Projects Updated On Fri, Nov 3rd, 2023 by Saurenergy SJVN has issued a tender inviting bids from solar power developers for the establishment of 1.5 GW of interstate transmission grid (ISTS) connected solar power projects on a build-own-operate basis anywhere in India. SJVN will enter into a 25-year power purchase agreement (PPA) with the bidders who emerges successful. Power procured by SJVN from these […] Read more
KPI Green Energy Joins Hands with Uttarakhand Govt for 500 MW Solar Park Updated On Fri, Nov 3rd, 2023 by Saurenergy Independent Power Producer KPI Green Energy Limited, in partnership with Advait Infratech Limited, has entered into a Memorandum of Understanding (MoU) with the Government of Uttarakhand. The agreement sets sights on setting up a 500 MW solar park under the Captive Power Producer (CPP) segment. KPI Green Energy has won several orders in the recent […] Read more