MSEDCL Invites RFS for 230 MW Solar Project Through Competitive Bidding By Saur News Bureau/ Updated On Tue, Nov 15th, 2022 Highlights : Maharashtra State Electricity Distribution Company Ltd. (MSEDCL) has invited RFS (request for selection) for a 230 MW of solar power project tender through a competitive bidding process in Maharashtra. The last date for submitting the online bid is November 16, 2022, till 04:00 pm and the bid will be opened on the same day at 06:00 pm. MSEDCL Issues Tender for 615 MW Solar Projects Maharashtra State Electricity Distribution Company Ltd. (MSEDCL) has invited RFS (request for selection) for a 230 MW of solar power project tender through a competitive bidding process in Maharashtra. The Successful bidders shall develop ground-mounted solar PV power projects subject to the conditions specified and as per the list of lands annexed. The last date for submitting the online bid is November 16, 2022, till 04:00 pm and the bid will be opened on the same day at 06:00 pm. MSEDCL Gives LoA to TPREL for Setting up 150 MW Solar Plant in Maharashtra Also Read This MSEDCL 230 MW solar tender includes the scope of the work of setting up the solar plant of awarded capacity, including design & engineering, manufacture/procurement, supply, installation, testing, and commissioning including warranty obligation with comprehensive operation and maintenance. As per the tender document, the minimum individual project capacity to be developed shall be 2 MW & maximum individual project capacity to be developed shall be 10 MW (2X5 MW). Each interested bidder will have to pay Rs. 15,000 (excluding 18% GST) as a cost of the tender document, which is non-refundable. Each interested bidder will also have to pay Rs. 10,000 per MW (excluding 18% GST) as a bid processing fee, which is also non-refundable. The awarded bidder must pay Rs. 1 lakhs per MW as an earnest money deposit. The selected bidder also must provide Rs. 5 Lakh/MW as a performance bank guarantee (PBG) after the issuance of the letter of intent and before signing the power purchase agreement (PPA). The successful bidder must have a minimum annual turnover of Rs. 25 lakhs/MW during the previous financial year i.e., FY 2021-22, or as on the date at least 7 days before the due date of bid submission. MSEDCL Invites RFS for 500 MW Wind Solar Hybrid Projects Also Read The Net-Worth of the awarded bidder for the financial year ended on 31.03.2022 shall not be less than Rs 0.55 Crores per MW or as on the date at least 7 days before the due date of bid submission. Bidders can view/download this MSEDCL 230 MW solar power project tender documents and technical specifications here. Recently, Maharashtra State Electricity Distribution Company Ltd. (MSEDCL) invited RFS (request for selection) for a 500 MW of solar wind hybrid project tender on a long-term basis. MSEDCL Floats Tender for 500 MW Intra-State Solar Projects Also Read Tags: 230 MW solar tender, Clean Energy, green energy, grid-connected project, India, Maharashtra State Electricity Distribution Co Ltd, MSEDCL, Renewable Energy, Solar, Solar Energy, Solar Power, tender