MMRDA Issues Tender for 7.63 MW of Rooftop Solar Projects for Mumbai Metro

MMRDA Issues Tender for 7.63 MW of Rooftop Solar Projects for Mumbai Metro

The last date of bid submission is March 15, 2019, and the tender will open on March 18, 2019

mumbai-metro

The Mumbai Metropolitan Region Development Authority (MMRDA) is inviting bids for setting up of 7.63 MW of rooftop solar PV projects at the site of Mumbai Metro Rail project line 7 and 2A.

The brief scope of work includes the supply, design, engineering, manufacturing, storage, civil work, erection of the suitable structure, testing and commissioning of the project.

The project will be developed under Renewable Energy Service Companies (RESCO) model, and the winning bidder will enter into a Power Purchase Agreement (PPA) with MMRDA for the supply of Solar Power for 25 years from the Date of Commissioning. The developer will also be responsible for the comprehensive Operation and Maintenance (O&M) of the project for a period of 25 years.

The last date of bid submission is March 15, 2019, and the tender will open on March 18, 2019. A pre-bid meeting will be held on February 25, 2019, to address the concerns raised by the prospective bidders.

To be eligible, the bidder should have total installed and commissioned capacity of grid-connected Solar PV Project of minimum 3.815 MW during the last 10 years ending 31.01.2019. And Rooftop Solar PV Project capacity of minimum 0.95 MW in the last 10 years.

The Annual Turnover in any one of the last 5 financial years for the bidders should not be less than Rs 15.26 crores.

For more information click here.

"Want to be featured here or have news to share? Write to info[at]saurenergy.com