J&K Issues Tender For 4000 Solar Pumps Of 30 kWp Under PM KUSUM By Chitrika Grover/ Updated On Thu, Feb 15th, 2024 Highlights : The tender was issued for the maintenance of grid connected solar PV systems in range of 1 kWp to 30 kWp along-with SVFD and other allied equipment. The bids are invited from the eligible bidders through e-tendering. The bid document mentioned, the bid will be available from 9th February 2024 to 1st March 2024. J&K Issues Tender For 4000 Solar Pumps Of 30 kWp Under PM KUSUM Jammu &Kashmir Energy Development Agency (JAKEDA) released a tender for empanelment of vendors for supply, installation, testing, commissioning of installation, commissioning of solar projects. The project is undertaken for the solarization for 4000 existing individual grid connected agriculture pumps under PM-KUSUM Scheme (Component-C) in the union territory (UT) of Jammu & Kashmir (J&K). JAKEDA issued the tender for the maintenance of grid connected solar PV systems in range of 1 kWp to 30 kWp along-with SVFD and other allied equipment. The tender was issued on behalf of the Lt. Governor of Union Territory (UT) of J&K, online tenders for two cover systems. The bids are invited from the eligible bidders through e-tendering. The bid document mentioned, the bid will be available from 9th February 2024 to 1st March 2024. The date and time of opening of technical bids is 4th March 2024. J&K village to become first carbon-free solar panchayat Also Read The bidders are expected to furnish the earnest money (Refundable) and interest free bid bond in the form of TDR/FDR/CDR/Bank guarantee, for an amount of Rs 50 Lakhs, drawn in favor of chief executive officer (CEO) JAKEDA, payable at Jammu/Srinagar. The validity of Bid Bond/EMD is for a period of one year from the bid deadline. Other details can be seen in the bidding documents from the website – https://jktenders.gov.in. The tenderershould study the document carefully and fill up the same with considerations to all provisions of the tender.document. J&K to Purchase 200 MW Solar Power from SECI for Next 25 Years Also Read Tags: grid-connected solar, Jammu & Kashmir (J&K)., Jammu Kashmir Energy Development Agency, JEDA), PM-KUSUM, PM-KUSUM Scheme (Component-C)