INKEL Floats Wind Energy Plant Tender for 14 MW in Kerala By Saur News Bureau/ Updated On Mon, Oct 10th, 2022 Highlights : Public-private partnership firm, INKEL Ltd. has floated a tender for the supply of a 14 MW capacity wind energy power plant in Palakkad district, Kerala. The last date for submitting the online bid is October 15, 2022, and the bid will be opened on the same day. Public-private partnership firm, INKEL Ltd. has floated a tender for the supply of a 14 MW capacity wind energy plant in Palakkad district, Kerala. The last date for submitting the online bid is October 15, 2022, and the bid will be opened on the same day. The scope would cover manufacture, inspection at supplier’s works, Packing & forwarding, supply, storage at site, insurance, transport and safe logistics, erection, testing & commissioning of 14 MW wind power project along with power evacuation including approval for connectivity, LTA and tariff metering system. The scope of work also includes performance guarantee test (PG Test), operation & maintenance for ten (10) years including one year warranty for the entire project from commercial operation declaration (COD) and transfer of warranty of specific equipment by OEM. The bidders must have experience in the same kind of work. “Similar work” shall mean: “engineering, procurement, and construction (EPC) contract for the capacity of 5MW of wind turbine generators at a single location.” INKEL Commissions 0.6 MW Solar Plant in Kerala Under IPDS Scheme Also Read OR “Owning and Operating of at least 50 MW of wind farm.” Experience of having completed similar works during the last 7 years ending 31.01.2022 should be either of the following: – Tender For 9348 Agricultural Pumps Under KUSUM Yojana in Kerala Also Read Three similar completed works rated capacity not less than 6MW cumulative rated capacity of wind turbine generators. OR Two similar completed works rated capacity not less than 8MW cumulative rated capacity of wind turbine generators. Kerala Electricity Board Awards Hero Future Energies 10-MW Battery Storage Project Also Read OR One similar completed work rated capacity not less than 12MW cumulative capacity of wind turbine generators. The minimum average annual financial turnover of the bidder during the last three years should be Rs. 50 crores. (ending on 31st March of the previous financial year). The net worth of all the bidders for the last three (3) financial years (FY 2020-21, 2021-22 & 2022- 23) shall be positive. Bidders can view/download this INKEL Ltd. 14 MW wind energy plant tender documents and technical specifications here. Earlier, INKEL Limited commissioned a 0.6MW grid-connected solar power plant at a 110 kV KSEB Substation at Kottiyam in the Kollam district of Kerala under the IPDS scheme. Tags: 14 MW capacity wind energy plant, Clean Energy, green energy, India, INKEL Ltd., Kerala, Palakkad district, Renewable Energy, tender, Wind, wind energy, wind turbine generators