Enel commissions 97 MW Carrera Pinto Solar PV Plant in Chile

Enel commissions 97 MW Carrera Pinto Solar PV Plant in Chile

Enel, along with its subsidiary Enel Green Power Chile Ltd. has commissioned and connected the PV solar park Carrera Pinto to the grid, located 60kms from the city of Copiapó in the Atacama Region of Chile.

Solar PV Plant in Chile

With an installed capacity of 97 MW, the new solar plant can generate more than 260 GWh each year, which is equivalent to the annual consumption needs of around 122,000 Chilean households, while avoiding the emission of more than 127,000 tonnes of CO2 into the atmosphere.

The company has invested approximately 180 million US dollars in the construction of 97 MW plant, in line with the Group’s strategic plan.

The commissioned park is supported by a long-term power purchase agreement (PPA), and the power generated by the plant will be transferred to Chile’s Central Region Transmission Network (Sistema Interconectado Central, SIC).

Source: Press Release

"Want to be featured here or have news to share? Write to info[at]saurenergy.com
      SUBSCRIBE NEWS LETTER
Scroll