Cauvery Neeravari Nigam Issues EoI for Empanelment of EPC Contractors for 4 MW Captive Solar

Highlights :

  • Cauvery Neeravari Nigam Limited (CNNL) has issued an expression of interest (EoI) for the empanelment of EPC contractors to develop a 4 MW captive solar plant for CNNL at Nanjangud Taluk, Karnataka.
  • The last date for submission of bids is 24.02.2023 at 16:00:00. The opening date for bids is 27.02.2023 at 11:00:00.
Cauvery Neeravari Nigam Issues EoI for Empanelment of EPC Contractors for 4 MW Captive Solar CNNL 4 MW tender
State-owned entity Cauvery Neeravari Nigam Limited (CNNL) has issued an expression of interest (EoI) for the empanelment of EPC contractors to develop a 4 MW captive solar plant for CNNL at Nanjangud Taluk, Karnataka.

The last date for submission of bids is 24.02.2023 at 16:00:00. The opening date for bids is 27.02.2023 at 11:00:00.

The document fee is INR 7.50 Thousand.

The bidder should have designed, supplied, installed, commissioned solar power plant (ground mounted/ canal top) within 5 years from the date of Request for EOI release. The minimum capacity shall be of
a) Single Project – 5 MWac
b) Cumulatively -20 MWac
(Rooftop solar projects of capacity 500 KW and above will also be considered for cumulative capacity of 20MWac).

The bidder should have experience in operations & maintenance of solar project (ground mounted / canal top) for a period not less than 3 years from the date of Request for EOI release. The minimum capacity shall be of
a) Single Project – 5 MWac
b) Cumulatively – 20 MWac

Late last year, the Cauvery Neeravari Nigam Limited (CNNL) made news when it drew up a plan of building a 12 to 15 feet tall fence in order to disable wild cats from straying into the garden and dam area. One part of the fence was to be powered by solar energy.

"Want to be featured here or have news to share? Write to info[at]saurenergy.com
      SUBSCRIBE NEWS LETTER
Scroll