Azure Power Starts Construction of 100 MW NTPC Project in Andhra Pradesh

Azure Power Starts Construction of 100 MW NTPC Project in Andhra Pradesh

solar power project in Andhra Pradesh

Azure Power has announced that it has started the construction of its 100MW solar power project in Andhra Pradesh. The Company has secured land and financing for this project.

 The project was auctioned by NTPC, which is designated under National Solar Mission for a total capacity of 1000 MW of solar power projects at Kurnool Ultra Mega Solar Park. The solar park is being developed by Solar Park Implementation Agency (SPIA), Andhra Pradesh Solar Power Corporation Limited (APSPCL).

The tariff on the project will be Rs.5.12/ kWh (US $0.077), power produced from the solar park will be supplied to NTPC for duration of 25 years. The project is expected to get commissioned by second quarter 2017.

Inderpreet WadhwaSpeaking on this occasion, Inderpreet Wadhwa, Founder and Chief Executive Officer, Azure Power said, “We have over 200MW portfolio with proven track record of operating solar power projects in Andhra Pradesh. With the commencement of the construction of this 100 MW project, we are delighted to make contribution towards realization of our Hon’ble Prime Minister’s commitment towards clean and green energy, through solar power generation. Our sincere gratitude to NTPC and the State of Andhra Pradesh, for all the cooperation and support extended.”

"Want to be featured here or have news to share? Write to info[at]saurenergy.com
      SUBSCRIBE NEWS LETTER
Scroll