Airports Authority of India Floats 1 MW Solar Tender for Begumpet Airport, Hyderabad By Saur News Bureau/ Updated On Fri, Nov 18th, 2022 Highlights : The Airports Authority of India has invited bids for the supply of a 1 MW capacity solar power project at Begumpet Airport, Hyderabad. The last date for submitting the bid for this 1 MW solar power project is December 13, 2022, till 06:00 pm & bids will be opened on December 15, 2022, at 11:00 am. Airports Authority of India Sets Net Zero & 100% Green Energy for Airports The Airports Authority of India has invited bids for the supply of a 1 MW capacity solar power project at Begumpet Airport, Hyderabad. The last date for submitting the bid for this 1 MW solar power project is December 13, 2022, till 06:00 pm & bids will be opened on December 15, 2022, at 11:00 am. This 1 MW solar tender includes the scope of the work of setting up the solar plant of awarded capacity, including design & engineering, manufacture/procurement, supply, installation, testing, and commissioning including warranty obligation with comprehensive operation and maintenance. AAI Decarbonises 14 Airports With 100% Renewable Energy Also Read The estimated cost of the whole project is Rs. 44,90,146/- (Excluding GST). Each interested bidder will have to pay Rs. 1180 (excluding 18% GST) as a tender processing fee. Each interested bidder will also have to pay Rs. 89,803/- as an earnest money deposit/bank guarantee. To procure this tender, the bidders must have experience in the same kind of work with ground-mounted solar power projects connected to the grid within the previous five years. The projects must comprise transmission line construction, switchyard/substation bay, design, supply, installation, testing & commissioning, operation, and maintenance of grid-connected solar power plants. Average annual financial turnover during the last 3 years, ending 31st March of the previous financial year, should be Rs. 13,47,044/- from the last three financial years ending on 31.03.2021 based on audited annual accounts. Airports To Become Carbon Neutral By December 2024 Also Read The net worth of the bidder during the last Financial Year shall be Rs. 6,73,522/-, wherein the net worth shall be calculated as follows: Net Worth = (Equity + Reserves) – (Revaluation reserves+ intangible assets + miscellaneous expenses to the extent not written off + carried forward losses) Bidders can view/download this Airports Authority of India for 1 MW of MONO PERC solar modules tender documents and technical specifications here. Airports A Better Option Than Households for Rooftop Solar- RMIT University Study Also Read Recently, 14 airports out of 125 airports, falling under the Airport Authority of India, achieved decarbonisation with 100% renewable energy. Running on renewable energy to meet the operational requirements, the list of carbon-free airports includes Tezu airport, Kangra airport, Kullu airport, Shimla airport, Jammu airport, Srinagar airport, Leh airport, and Imphal airport, Dimapur airport, Puducherry airport, Pakyong airport, Kanpur airport, Dehradun airport, and Patna airport. Tags: 1 MW capacity solar power project, AAI, Begumpet Airport, Clean Energy, Decarbonisation, Green Energy transition, Hyderabad, India, Renewable energy industry, solar plants, solar tender, tender, The Airports Authority of India