PRE-BID MEETING : SELECTION OF SOLAR POWER DEVELOPERS FOR SETTING UP OF 3GW ISTS CONNECTED SOLAR PV POWER PLANT LINKED WITH SETTING UP OF 1.5GW (PER ANNUM) SOLAR MANUFACTURING PLANT UNDER GLOBAL COMPETITIVE BIDDING (PHASE-II)

PRE-BID MEETING : SELECTION OF SOLAR POWER DEVELOPERS FOR SETTING UP OF 3GW ISTS CONNECTED SOLAR PV POWER PLANT LINKED WITH SETTING UP OF 1.5GW (PER ANNUM) SOLAR MANUFACTURING PLANT UNDER GLOBAL COMPETITIVE BIDDING (PHASE-II) Tata Power Renewable Energy Limited in 12.5 MW PDA with Supreme Petrochem Limited

This has reference to the RfS No. SECI/C&P/RfS/1.5GW MANUFACTURING/P-2/012019 regarding the RfS Selection of Solar Power Developers for Setting up of 3GW ISTS Connected Solar PV Power Plant linked Setting up of 1.5GW (Per Annum) Solar Manufacturing Plant under Global Competitive Bidding (Phase-II).

The Pre-Bid Meeting has been rescheduled as per following details

Date : 18.02.2019

Timing : 1430 HRS to 1630 HRS

Venue : “Jacaranda”, Habitat World, India Habitat Centre, Lodhi Road, New Delhi – 110 003 (Entry from Gate No. 03)

Contact Persons : Sh. Manas Ranjan Mishra, Manager (C&P) and Sh. Vineet Kumar, Manager (Solar) (0091 11 71989294/ 0091 11 71989245)

It is requested that maximum 02 participants from a bidder shall attend the meetingand the participants are requested to arrive at the venue by 1400 HRS for registration.

Prospective bidders are requested to remain updated for any notices/ amendments/ clarifications etc. to the RfS documents through the websites www.seci.co.in and https://www.tcil-india-electronictender.com as no separate notification will be issued.

Tender Search Code (TSC) for the RfS in TCIL : SECI-2019-TN000003

Tender ID for the RfS in CPPP : 2019_SECI_ 404297_1