Vikram Solar Bags 1 MW Floating Solar Project From Hindustan Zinc Updated On Thu, Feb 7th, 2019 by Saurenergy The solar plant is expected to have an energy yield of 1993 MWh/Year. Vikram Solar, a leading domestic module manufacturer and solar & EPC solutions provider has bagged the project order for a 1 MW Floating solar plant from Hindustan Zinc Limited. The plant will be located at Ghosunda Dam, Near Chittorgarh, Rajasthan. The floating […] Read more
SECI and Govt of Puducherry Sign PSA For 100 MW Wind Power Updated On Thu, Feb 7th, 2019 by Saurenergy SECI announce an agreement with the Electricity Department of Puducherry for sourcing 100 MW of wind power. The Electricity Department of the Government of Puducherry has signed an agreement with the Solar Energy Corporation of India (SECI) to source 100 MW of Wind Power. The new agreement will be slotted under the Union Territory’s Renewable […] Read more
Greener Buildings in Orissa. Govt to consider Solar Power in Building Laws Updated On Thu, Feb 7th, 2019 by Saurenergy The Department also seeks to make adherence to energy efficient building code mandatory for obtaining the building plan approval in Urban Local Bodies. The state government of Odisha may soon make it mandatory for buildings to install solar panels on rooftops by making a provision in the building plan approval. In support of the new […] Read more
Haryana Issues Tender For 10 MW Floating Solar PV Plant Updated On Thu, Feb 7th, 2019 by Saurenergy The floating plant will be set up at a raw water reservoir at the Rajiv Gandhi Thermal Power Plant in Khedar, Hisar. The Haryana Power Generation Corporation Limited (HPGCL) has floated a tender for developing a 10 MW floating solar PV power plant in the state. The HPGCL will provide the site for free and […] Read more
Chandigarh Administration Seeks Power Usage Details With Plans to Go Solar Updated On Thu, Feb 7th, 2019 by Saurenergy The Chandigarh Administration has asked different departments in the Union Territory with their own buildings to provide details of their power consumption to the UT, as it plans to install rooftop solar power systems on government buildings. The Chandigarh Administration has asked different departments in the Union Territory with their own buildings to provide details of their power […] Read more
Bangalore International Airport Inaugurates Rooftop Solar Plant Updated On Thu, Feb 7th, 2019 by Saurenergy The solar system is expected to generate around 4.7 million units of power per annum. The Kempegowda International Airport (Bangalore) inaugurated its 3.35 MW rooftop solar power plant. The power generated from the rooftop systems will be used to meet the electricity demands of the airport. The solar system is expected to generate around 4.7 […] Read more
Arunachal Pradesh Soon to Be Declared 100% Electrified Updated On Thu, Feb 7th, 2019 by Saurenergy The PM will lay the foundation stone of Sella Tunnel and its approach road in Tawang district besides the declaration of 100 percent household electrification in the state under the Saubhagya Scheme. Prime Minister Narendra Modi on his visit to Arunachal Pradesh on February 9, 2019, is set to declare the state 100 percent electrified. […] Read more
CCEA Approves Proposal For Setting Up 12 GW Solar Projects Updated On Thu, Feb 7th, 2019 by Saurenergy The Scheme will mandate the use of both solar photovoltaic cells and modules manufactured domestically. The Cabinet Committee on Economic Affairs (CCEA) has approved the Ministry of New & Renewable Energy’s (MNRE) proposal for implementation of the Central Public Sector Undertaking (CPSU) Scheme Phase-ll for setting up 12,000 MW grid-connected Solar Photovoltaic (PV) Power Projects, […] Read more
SECI Reschedules Pre-Bid Meeting for 3 GW Manufacturing Linked Solar Tender Updated On Thu, Feb 7th, 2019 by Saurenergy The pre-bid meeting scheduled for February 13, 2019, has been rescheduled for February 18, 2019. The Solar Energy Corporation of India (SECI) has rescheduled the pre-bid meeting for its RfS issued for selection of solar power developers for setting up of 3 GW ISTS connected solar PV power plant linked with setting up of 1.5 […] Read more