Greenko, ReNew Power win SECI’s 1.2 GW Hybrid Plus Storage Tender Updated On Sat, Feb 1st, 2020 by Saurenergy Greenko Group and ReNew Power have won with their bids in SECI’s 1.2 GW wind-solar hybrid projects with energy storage tender and peak power supply. The Greenko Group and ReNew Power have won with their bids in the Solar Energy Corporation of India’s (SECI) 1.2 GW wind-solar hybrid power projects with energy storage tender and […] Read more
India Sets Sight for 450 GW RE Capacity by 2030: President Kovind Updated On Fri, Jan 31st, 2020 by Saurenergy India has embarked on an ambitious target of having 450 GW of renewable energy by 2030 to capitalise on its clean resources, President Ram Nath Kovind said India has embarked on an ambitious target of having 450 GW of renewable energy by 2030 and also provide 17 lakh solar pumps to farmers under Pradhan Mantri-Kusum […] Read more
Budget 2020: Solar Industry Seeks Policy Reforms for Ease of Doing Biz Updated On Fri, Jan 31st, 2020 by Saurenergy With the release of the Economic Survey 2020 today, by the Chief Economic Adviser Krishnamurthy V Subramanian, which is the reflection of the Modi 2.0 government’s annual report card, all eyes are on the Finance Minister Nirmala Sitharaman’s Budget 2020 presentation on February 01, 2020. In Budget this year, Finance Minister Sitharaman is likely to […] Read more
EXIM Bank Grants $35.8 Mn to Republic of Suriname for Hybrid PV Systems Updated On Fri, Jan 31st, 2020 by Saurenergy Exim Bank has extended a LOC to the Government of the Republic of Suriname, for financing a rural electrification project using solar DG hybrid PV systems The Export-Import Bank of India (Exim Bank) has, on behalf of the Government of India, extended a Line of Credit [LOC] of USD 35.80 million, to the Government of […] Read more
Tenders Issued for Solar Plants for Agro-PV-Concept at NISE Gurugram Updated On Fri, Jan 31st, 2020 by Saurenergy NISE has issued a tender for the commissioning of the 30 kWp solar PV power plant at the NISE Campus in Gurugram. The National Institute of Solar Energy (NISE) has issued a tender, inviting bids from original manufacturers of solar PV modules, for the commissioning of the 30 kWp solar photovoltaic (SPV) power plant at […] Read more
BHEL Tenders for O&M of 1.7 MW Solar Plant in MP Updated On Fri, Jan 31st, 2020 by Saurenergy BHEL has issued a tender for undertaking the O&M of a 1.7 MW solar power plant in Bina, Madhya Pradesh. Bharat Heavy Electricals Limited (BHEL) has issued a tender, inviting bids from eligible vendors for undertaking the operation and maintenance (O&M) of a 1.7 MW solar power plant in Bina, Madhya Pradesh. The scope of […] Read more
The Red Tape Challenge. How RE Producers in India Are Squeezed Updated On Fri, Jan 31st, 2020 by Saurenergy While meeting people within and outside the renewables industry, almost everyone agrees that unlike other sectors, a key part of the work, namely, the actual build up of renewable projects, in terms of procurement, transportation and commissioning at site, is probably the easiest part of the job.In fact, the mismatch between the time taken to […] Read more
EVs to Cost Less Than ICE Vehicles Inside 3 Years: Niti Aayog CEO Updated On Fri, Jan 31st, 2020 by Saurenergy EVs will cost less than ICE vehicles in 3 years as the price of battery packs is expected to fall by almost 51% per unit, NITI Aayog CEO Amitabh Kant said Electric Vehicles (EVs) will become cheaper than internal combustion engine (ICE) vehicles in three years as the price of battery packs of EVs is […] Read more
MNRE Offers Clarification on Phase II of Rooftop Solar Programme Updated On Thu, Jan 30th, 2020 by Saurenergy MNRE which has been implementing Phase II of the rooftop solar programme has issued a new clarification regarding the CFA and empanelment of the bidders. The Ministry of New and Renewable Energy (MNRE) which has been implementing Phase II of the grid-connected rooftop solar programme has issued a new clarification regarding the CFA and empanelment […] Read more