Visaka Industries Granted 20-year Patent Rights for ATUM Solar Roof Updated On Wed, Sep 16th, 2020 by Saurenergy Visaka Industries has been granted a 20-year patent for its ATUM Solar Roof, for the invention titled “Eco-Friendly Energy Generating Roof.” Visaka Industries Limited has been granted a 20-year patent for its ATUM Solar Roof. The patent has been granted for the invention titled “Eco-Friendly Energy Generating Roof.” ATUM is a roof that generates electricity. […] Read more
UL Receives Accreditation to Test RE Plants in India per CEA Grid Codes Updated On Wed, Sep 16th, 2020 by Saurenergy UL has received accreditation from DAkkS that enables it to test renewable energy (RE) power plants per CEA of India grid codes. UL, a global safety science company, has announced that it has received accreditation from Deutsche Akkreditierungsstelle GmbH (DAkkS) that enables it to test renewable energy (RE) power plants per Central Electricity Authority (CEA) […] Read more
Manufacturing Boosted by Low Tariffs Will Help Atmanirbhar Bharat: RK Singh Updated On Wed, Sep 16th, 2020 by Saurenergy RK Singh believes Lower tariffs will boost local manufacturing in the country, which in turn will contribute to achieving the goal of Atmanirbhar Bharat. Union Minister for Power and New and Renewable Energy RK Singh has said that the competitiveness of the Indian solar industry which has seen tariff drops to a record low will […] Read more
As India Presses for Domestic Manufacturing, Bifacial Modules Should Get Their Due Updated On Wed, Sep 16th, 2020 by Saurenergy At last count, over 12 GW of manufacturing announcements or at least an intent to manufacture solar cells and modules had been announced in India. The names include firms with an established record for execution, as well as firms that are building one now. From the Adani Group, to Azure Power, Renew Power, to Tata […] Read more
SECI Fails To Wriggle Out of MERC Jurisdiction. Faces MSEDCL Claims for Damages Updated On Tue, Sep 15th, 2020 by Saurenergy In an order with possibly far reaching consequences for SECI (Solar Energy Corporation of India), the Maharashtra Electricity Regulator (MERC) has opted to place the central government undertaking on the dock, for a claim brought in by MSEDCL (Maharastra state Electricity Distribution Company Limited). MSEDCL’s main complaint against SECI, which it opted to bring before […] Read more
Another Deadline Extension for 15 MW Floating Solar Tender in Himachal Updated On Tue, Sep 15th, 2020 by Saurenergy SECI, for the 4th time, has extended the bid deadline for its tender for setting up of 15 MW floating solar plant at the Nangal Pond in Himachal Pradesh. The Solar Energy Corporation of India (SECI) has once again extended the bid submission deadline for its tender for the selection of solar power developers for setting up of 15 […] Read more
SECI Extends Timeline for its 97.5 MW Rooftop Solar PV Tender Updated On Tue, Sep 15th, 2020 by Saurenergy SECI has extended the timeline for the implementation of 97.5 MW rooftop solar PV system shame for government buildings in different zones of India The Solar Energy Corporation of India (SECI) has notified of the extension in timelines for the implementation of 97.5 MW grid-connected rooftop solar PV system shame for government buildings in different […] Read more
751.52 MW of RE Capacity Added in August, Total at 88.65 GW: MNRE Updated On Tue, Sep 15th, 2020 by Saurenergy The Ministry of New and Renewable Energy (MNRE) has issued a monthly summary for August 2020, revealing that a total of 751.52 MW of RE capacity was added during the month, which took India’s total to 88.65 GW. The Ministry of New and Renewable Energy (MNRE) has issued a monthly summary for the Cabinet for […] Read more
SECI Tenders for 100 MW Solar Plus 50 MW Storage in Chhattisgarh Updated On Mon, Sep 14th, 2020 by Saurenergy SECI has issued a tender for the commissions of a 100 MW (ac) solar project along with a 50MW/ 150 MWh storage in Rajnandgaon, Chhattisgarh. The Solar Energy Corporation of India (SECI) has issued a tender for the commissioning of a 100 MW (ac) solar project (200 MWdc) along with a 50MW/ 150 MWh Battery […] Read more