KREDA Issues Tender for Solar Battery Banks in Ladakh By Saur News Bureau/ Updated On Thu, Aug 18th, 2022 Highlights : Kargil Renewable Energy Development Agency (KREDA) has floated a tender for supply, installation and commissioning of solar tubular GEL Battery Banks of various capacities at various locations across the Kargil District. The last date for submitting the online bid is August 27, 2022, till 2:00 pm. Bids will be opened on the same day at 4:00 pm. Kargil Renewable Energy Development Agency (KREDA) has floated a tender for supply, Installation and commissioning of solar tubular gel battery banks of various capacities at various locations across the Kargil District in the union territory of Ladakh. A high-performance tubular gel battery with a polypropylene copolymer container should be used. A pressure regulation valve should be included with the battery, and it should be explosion-proof. It should be possible to open the valve unit only with the right tool. The last date for submitting the online bid is August 27, 2022, till 2:00 pm. Bids will be opened on the same day at 4:00 pm. SECI to Conduct a 2nd Pre-Bid Meeting for Solar + Storage Tender in Ladakh Also Read The company should be an Indian company that manufactures solar batteries or solar engineering, procurement, and construction (EPC) firm that is a licensed dealer of the original Indian manufacturer of solar batteries. The manufacturer of solar batteries must be certified to ISO 9001 and ISO 14001 for the design, development, manufacture, and sale of Batteries. In the case of a solar EPC company, the organisation should have ISO 9001 and ISO 14001 for quality management systems for the supply, installation and commissioning, servicing, and maintenance of renewable energy systems, as well as a dealership certificate from the manufacturer of solar batteries with these certifications for the design, development, manufacture, and sale of solar batteries. Interested bidders will be required to provide an earnest money deposit equal to 2% of the project cost to participate in the bidding process. Within 30 days of the purchase order date, the successful bidder will need to provide a security deposit equal to 3% of the contract’s value. Another Deadline Extension for SECI’s Solar Plus Storage Project in Ladakh Also Read The bidders must have had an annual turnover of at least Rs. 1.88 crore during the previous three financial years. The successful bidder will ensure the maintenance of the battery bank for a period of five years from the date of commissioning and installation. a complete warranty would cover the battery bank. Bidders can view/download this Kargil Renewable Energy Development Agency (KREDA) solar gel batteries tender documents consisting of notice inviting tender, an invitation to bidders, scope of work, bidding documents, general terms and conditions of contract, erection conditions of contract, annexures, and technical specifications here. Last month, NHPC (National Hydro Electric Power Corporation) entered into two MoUs for the execution of pilot green hydrogen technologies in the Leh and Kargil districts of Ladakh. SECI Extends Deadline for 14 MW Solar Project with Linked Storage in Ladakh Also Read Tags: battery energy storage solution (BESS), Clean Energy, green energy, India, Kargil, Ladakh, Leh, pre-bid meeting, Renewable Energy, SECI, SECI Pre-Bid Meeting Ladakh, Solar, Solar Energy, Solar Ladakh, Solar Project, Solar Projects, storage, tender