Associate Vice President – Project Management

Adani Green Energy Ltd

  • Mundra, Gujarat
Associate Vice President – Project Management
Job Posted : Aug 23rd, 2022

Job Description

Project Construction activities for Common Infrastructure like Seawater Desalination plant, Seawater Supply and Return header,Common Roads, Draings, ETP, STP network, Construction enabling activities, Electrical Switchyard/ Substation development, OSBL piperack, piping and other OBL infrastructure.
This position will be responsible for all Infrastructure and OSBL Project work including Substation, Desalination plant, Seawater Intake and Return pipelines, including coordination for project Management, Engineering Management, Contractor/ Vendor Management and site management. The Cell & Module  plant is a solar manufacturing plant which is forward integration of Ingot & wafer plant.. . The person should have hands on experience to drive the Engineering coordination &  Construction work as per set targets with utmost safety and quality. He needs to coordinate with Consultant/ Engineering team/TC team and lead the site Mehanical  team of Cell & Module for timely completion of the installation and commissioning work.

Roles and Responsibilities:-

Strategic Roles & Responsibilities:-

  • Coordinate internal resources and third parties Contractors for the flawless execution of projects
  • Ensure that all projects are delivered on-time, within scope and within budget
  • Assist in the definition of project construction t scope and objectives, involving all relevant internal stakeholders and ensuring technical feasibility
  • Ensure resource availability and allocation
  • Develop a detailed project plan to monitor and track progress
  • Manage changes to the project scope, project schedule, and project costs using appropriate verification techniques
  • Measure performance using appropriate project management tools and techniques
  • Report and escalate to management as needed
  • Manage the relationship with the client, relevant stakeholders & third parties/vendors
  • Perform risk management to minimize potential risks
  • Create and maintain comprehensive project documentation
  • Delegate project tasks based on junior staff members’ individual strengths, skill sets, and experience levels
  • Track project performance, specifically to analyze the successful completion of short and long-term goals
  • Meet budgetary objectives and make adjustments to project constraints based on financial analysis
  • Use and continually develop leadership skills
  • Develop spreadsheets, diagrams and process maps to document needs

Technology and IT Enablement:-

  • SAP, MS Office, MS projects and related tools
KRAs with  Outcomes ( Jobs which brings value to the organisation)
Domain Keys Result Ares Outcomes
Progress Report • Prepare PPT related to project progress and budgetory/expenditure to Mgt.
• Follow up & Expedite with multiple stake holder for the speed up of project works.
Monitoring progress
Budgetory/expenditure • Prepare budgetory/expenditure to Mgt. Monitoring Expenditure
Installation, testing, commissioning and project execution With in agreed timeline. Project Execution in safety and quality in time, budget, scope
Safety culture No safety voilance during project execution, operation and maintenance 100% adherence to Safety norms as per agreed norms
Interface Engineering 1. Project progress report preparation
2. planning for Project Schedule
3. Follow-up & compliance of HSE and pending jobs/modifications etc.
Safety Norms and Implementation of Corrective action
Vendor management 1. Material min-max implementation
2. Creating PR & follow-up action for make the material at site
3. Checking for project material requirements & action plan to make the same available at site
4. Assist Procurement team for finalisation of order.
5. Vendor/Contractor  Management, Audit, Approvals etc.
Reduction of approval cycle and timely delivered Packages to sites
Daily Analysis Daily report of project planning & execution and gap analysis with action plan to be shared. Analytical thinking, Problem solving skills, decision making and working towards excellence
Stake Holders
Internal External
Project Management, Site Management, Vendor Management and Techno commercial/Finance team. vendors / contractors
Competency
Technical Competency ( To be filled by HM & HR ) Behavioural Competency
Competency Desirable Competency Desirable
Project Management Skills PL – 4 Strategic Orientation PL – 3
Development skills PL – 4 Entrepreneurial Mind-set PL – 3
Understanding of technical specifications of equipment PL – 3 Stakeholder Partnering PL – 3
Cost Estimation PL – 3 Outcome Orientation PL – 3
Team Building PL – 3 Transformation Focus PL – 3
Internal Stakeholder Management PL – 3 Innovation Focus PL – 3
Inspection & Testing Plan PL – 3 Team Orientation PL – 3
Employee Development PL – 3

Educational Qualification:-

  • B.E / B.Tech – Mechanical/Electrical  Engineer (Full Time)

Experience:-

  • 15 – 18 Years experience in Infrastructure projects.

Location:-

  • Mundra, Gujarat.

Company Overview:-

Adani Green Energy Limited (AGEL) is one of the largest renewable companies in India, with a current project portfolio of 13,990 MW. AGEL is part of the Adani Group’s promise to provide a better, cleaner and greener future for India. Driven by the Group’s philosophy of ‘Growth with Goodness’, the Company develops, builds, owns, operates and maintains utility-scale grid-connected solar and wind farm projects. The electricity generated is supplied to central and state government entities and government-backed corporations.

      SUBSCRIBE NEWS LETTER
Scroll