Assistant Manager- Electrical (ERC)

Adani Green Energy Ltd

  • Ahmedabad, Gujarat
Assistant Manager- Electrical (ERC)
Job Posted : May 6th, 2022

Job Description

  • Basic Engineering  of Electrical work
  • Review of detailed engineering for Electrical work

Key Responsibilities:-

Primary Area of Responsibility – 90%:-

  • Selection of Electrical Equipment as per process requirement, P & I D and Tender Documents, and Scrutinized the scope of work for Electrical.
  • Preparation of Electrical Documents i.e. Electrical Load List, MCC Sizing, SLD, Cable Sizing, Transformer Sizing, Capacitor Sizing, DG set sizing, Substation sizing, Cable Schedule etc.
  • Preparation, Review & Submission of Drawings i.e. earthing layout, MCC room Layout, Cable Route Layout, Single Line Diagrams and Equipment GA Layout etc. for client/consultant approval.
  • Preparation of Electrical BOQ& cost estimation Electrical System of entire plant.
  • Preparation of Electrical Equipment Datasheets i.e. Transformer Datasheet, HT Panel Datasheet, LT Panel Datasheet, UPS Datasheet, LCS Datasheet, Cable Datasheet, Cable Tray Datasheet, etc.
  • Preparation of Detailed Vendor Scope & Material Requisition as per Tender Requirement
  • Technical Evaluation of the bids received from vendors
  • Design know how of High voltage switchyard (AIS) up to 220kV with applicable standards and regulations.
  • Knowledge of ETAP (Single Line Creation as per ANSI/IEC, Short ckt analysis & Load Flow analysis)

Primary Area of Responsibility –10 %:-

  • Coordination with other departments for inputs
  • Discussion with Vendors budgetary cost and technical inputs if any
Success Measures
Domain Key Result Area Success Measure
Engineering
  • Preparation of above listed deliverables
  • Timely delivery
  • Accuracy

 

Cost estimation
  • Offers and rapport with vendors for urgent requirements
  • Timely completion to meet deadline
  • Accuracy

 

People Management
  • Implementation of talent initiatives (timely)
  • Team training
  • Maintaining team engagement
  • No. of talent initiatives implemented
  • No. of training hours for team (planned vs actual)
  • % Increase in engagement score

Qualifications:-

  • Essential: BE Electrical

Experience:-

  • 2-3+ years of professional experience

Location:-

  • Ahmedabad, Gujarat.

Company Overview:-

Adani Green Energy Limited (AGEL) is one of the largest renewable companies in India, with a current project portfolio of 13,990 MW. AGEL is part of the Adani Group’s promise to provide a better, cleaner and greener future for India. Driven by the Group’s philosophy of ‘Growth with Goodness’, the Company develops, builds, owns, operates and maintains utility-scale grid-connected solar and wind farm projects. The electricity generated is supplied to central and state government entities and government-backed corporations.

      SUBSCRIBE NEWS LETTER
Scroll