Maharashtra Aims For 200K Solar Water Pumps By 2025 Updated On Sat, Oct 1st, 2022 by Saurenergy After the MEDA’s 50,000 solar water pumps tender under Pradhan Mantri Kisan Urja Suraksha Evam Utthaan Mahabhiyan (PM-KUSUM) Yojna’s component-B, now Maharashtra revealed its new target of installing solar water pumps. According to the Maharashtra government, these are the important parts of ongoing efforts to promote innovation in the solar pump in the agriculture sector. […] Read more
JUMIA Partners with BILITI Electric to Include E-Vans in Delivery Fleet Updated On Sat, Oct 1st, 2022 by Saurenergy Nigeria based e-commerce company, JUMIA has announced a partnership with California-based EV solutions provider BILITI Electric, to add e-vans to its delivery fleet in Kenya. Through this collaboration, both companies have completed the pilot project, and are set to scale the fleet within Kenya in the first phase, and eventually across Africa. According to both […] Read more
AGEL Commissions 600 MW Capacity of World’s Largest Hybrid Power Plant Updated On Fri, Sep 30th, 2022 by Saurenergy A wind-solar hybrid power plant in Jaisalmer, Rajasthan, with a 600 MW of capacity has been commissioned by Adani Green Energy (AGEL). The hybrid power project has been developed by two subsidiaries, Adani Hybrid Energy Jaisalmer Two and Adani Hybrid Energy Jaisalmer Three. According to the official statement, the project would include 150 MW of […] Read more
Italy Allocates 413 MW Of Renewable Energy Projects In 9th Auction Updated On Fri, Sep 30th, 2022 by Saurenergy In a fresh development, the energy agency of Italy, Gestore dei Servizi Energetici (GSE), has announced the results of the 9th renewable energy auctions of the country. The agency allocated over 413 MW of capacity for renewable energy projects of over 1 MW in size. Out of the total RE allocation, the agency awarded over […] Read more
GUVNL Floats Bids for 600 MW Solar Projects With A Greenshoe Option Updated On Fri, Sep 30th, 2022 by Saurenergy Gujarat Urja Vikas Nigam (GUVNL) has floated a tender to purchase power from 600 MW of grid-connected solar power projects at the Khavda Solar Park, Gujarat. There is a greenshoe option with an additional capacity of 600 MW for inclusion in this tender. The last date for submitting the bid for this 600 MW solar […] Read more
Amp Energy Collaborates With Ohmium International for 400MW Green Hydrogen Updated On Fri, Sep 30th, 2022 by Saurenergy New Delhi-based renewable energy company, Amp Energy India is collaborating with USA-based green hydrogen company Ohmium International for 400 MW of renewable capacity meant for green hydrogen production. Ohmium will provide the electrolysers for the projects. The deployments, aimed at mid-sized Commercial and Industrial (C&I) projects of 25MW or smaller, are planned to be installed […] Read more
UPNEDA Invites Bids for 50 MW of Rooftop Solar Projects in UP Updated On Fri, Sep 30th, 2022 by Saurenergy Uttar Pradesh New & Renewable Energy Development Agency (UPNEDA) has invited bids for 50 MW (Cumulative Capacity) of grid-connected rooftop solar projects. The government and semi-government buildings in Uttar Pradesh will host these solar projects. The Renewable Energy Service Company (RESCO) model will be used for each project on a net-metering basis. The last date […] Read more
Shining Bright. India’s Solar Start Ups Updated On Fri, Sep 30th, 2022 by Saurenergy When Prime Minister Narendra Modi launched the Start Up India movement in 2015 on August 15, perhaps even he wouldn’t have imagined the role startups were going to play in India’s clean energy transition. After all, the energy sector, with its tremendous policy overhang, large capital commitments, and the need for a long term perspective […] Read more