L&T bags an order for 50 MW solar power project from NHPC in Tamil Nadu Updated On Wed, Jun 21st, 2017 by Saurenergy According to the BSE filing , the 50 MW solar power project is anticipated to be completed within nine months. Larson and Tubro Ltd. has bagged an order of Rs 287.48 crore for setting up 50 MW solar power capacities from hydro power giant NHPC. The solar projects will be developed at Theni and Dindigul […] Read more
SECI invite bids for 750 MW grid connected solar PV power project in Rajasthan Updated On Wed, Jun 21st, 2017 by Saurenergy Solar Energy Corporation of India (SECI) notes that RfS document for the 750 MW solar project will be available for download from 21st June at 3pm. Last date for submission of is 4th August Solar Energy Corporation of India Limited (SECI) is inviting bid for setting up of 750MW grid connected solar PV power projects […] Read more
Solar Alliance signs JDA with Thompson Machinery for Development of Commercial Solar Projects in U.S. Updated On Tue, Jun 20th, 2017 by Saurenergy Solar Alliance will work with Thompson Machinery’s Power Division and a Thompson affiliated company, Aries Solar (“Aries”), to provide commercial solar solutions Solar Alliance Energy Inc. has announced that it has signed a Joint Development Agreement (“JDA”) with Thompson Machinery Commerce Corporation for development of commercial solar projects in Southeast U.S. Solar Alliance will work […] Read more
RaysExperts commissions 5.5 MW solar project for an Indian PSU Updated On Tue, Jun 20th, 2017 by Saurenergy Apart from this RaysExperts has also commissioned a 5.5 MW solar installation for Delhi Metro Rail Corporation. It also has major projects under NHPC, NDMC, SECI, and CPWD in the lineup. RaysExperts has announced the commissioning of its 5.5 MW solar project for an Indian PSU. The solar plant is projected to generate electricity worth […] Read more
Power2Drive India 2017 Exhibition to Showcase Best Electric Mobility Technology Updated On Tue, Jun 20th, 2017 by Saurenergy Piyush Goyal states that by 2030, not a single petrol or diesel car will be sold in the country. NITI Aayogas declared that Accelerated adoption of electric and shared vehicles could save $60 billion in diesel and petrol costs. Power2Drive, India’s most innovative exhibition for the electric vehicle industry, announces its highly anticipated 2017 exhibition. […] Read more
Sunworks to construct 1.1 Megawatt (MW) solar system at CSP Labs in Pleasant Grove, California Updated On Tue, Jun 20th, 2017 by Saurenergy CSP Labs will incorporate the 1.1 Megawatt (MW) solar system to offset more than 90% of its power consumption through long term partnership with Sunworks Sunworks, Inc. has announced a new project for a 1.1 Megawatt (MW) solar system that will be constructed at CSP Labs in Pleasant Grove, California. The 1.1 Megawatt (MW) solar […] Read more
Altus Power Acquires 6 MW Solar Project in California Updated On Tue, Jun 20th, 2017 by Saurenergy Altus Power notes that the solar project generates approximately 11 million kilowatt hours (kWh) of electricity annually, enough energy to power the equivalent of 800 homes Altus Power America, Inc. has announced the acquisition of a 6 megawatt (MW) DC ground-mounted single-axis tracker solar installation in Rancho Cordova, California. The solar energy system sells clean, […] Read more
Tamil Nadu Government Issues 1500 MW Solar Power Tenders Updated On Tue, Jun 20th, 2017 by Saurenergy Tamil Nadu has harnessed around 1,644 million units of solar energy during 2016-17 and considerable quantum of solar power generation is being realised during day time for around 800 MW to 1,200 MW. Tamil Nadu Government has floated tenders for generating solar energy to the tune of 1500 MW as part of its proposal to […] Read more
12000 Solar Power Pumps Distributed to Farmers under Saur Sujala Yojna in Chhattisgarh Updated On Tue, Jun 20th, 2017 by Saurenergy About 12,161 solar power pumps had been provided to the farmers till now against the target of 11,300 under ‘Saur Sujala Yojna’ since the inception of the scheme in November 2016. Over 12,000 solar pumps have been distributed so far to the farmers at subsidized rates under ‘Saur Sujala Yojna’ in Chhattisgarh. “About 12,161 solar […] Read more