POSTPONEMENT OF THE TENDER UPLOADING : SETTING UP OF 2000MW (250MW X 8) ISTS CONNECTED SOLAR POWER PROJECTS Updated On Mon, Jan 8th, 2018 by Saurenergy This has reference to the NIT No. SECI/C&P/SPD/RfS/2000MW/122017 publisheddated 29.12.2017 regarding the RfS Selection of Solar Power Developers for Setting up of 2000MW (250MW x 8) ISTS Connected Solar Power Projects, 250MW Capacity each of 08 Nos. of Packages to be installed anywhere in India. The RfS documents for the captioned RfS which was to […] Read more
POSTPONEMENT OF THE TENDER UPLOADING : SELECTION OF SOLAR POWER DEVELOPERS FOR SETTING UP OF 2000MW (250MW X 8) ISTS CONNECTED Updated On Mon, Jan 8th, 2018 by Saurenergy This has reference to the NIT No. SECI/C&P/SPD/RfS/2000MW/122017 published dated 29.12.2017 regarding the RfS Selection of Solar Power Developers for Setting up of 2000MW (250MW x 8) ISTS Connected Solar Power Projects, 250MW Capacity each of 08 Nos. of Packages to be installed anywhere in India. The RfS documents for the captioned RfS which was to […] Read more
Saur Energy International Magazine January 2018 Updated On Mon, Jan 8th, 2018 by Saurenergy Read more
RFS FOR SETTING UP OF 200 MW SOLAR PV PROJECTS IN PAVAGADA SOLAR PARK, KARNATAKA UNDER NSM PH-II, BATCH-IV Updated On Fri, Jan 5th, 2018 by Saurenergy RfS for Setting up of 200 MW Solar PV Projects in Pavagada Solar Park, Karnataka under NSM Ph-II, Batch-IV. The ETS No. for downloading the tender from TCIL website is SECI-2018-TN000006. Tender Document Read more
RFS FOR SETTING UP OF 750 MW SOLAR PV PROJECTS IN KADAPA SOLAR PARK, ANDHRA PRADESH UNDER NSM PH-II, BATCH-IV Updated On Fri, Jan 5th, 2018 by Saurenergy RfS for Setting up of 750 MW Solar PV Projects in Kadapa Solar Park, Andhra Pradesh under NSM Ph-II, Batch-IV. The ETS No. for downloading the tender from TCIL website is SECI-2018-TN000007. Tender Document Read more
RFS FOR SETTING UP OF 275 MW GRID CONNECTED SOLAR PV PROJECTS IN UTTAR PRADESH SOLAR PARK UNDER NSM PH-II, B-IV. Updated On Fri, Jan 5th, 2018 by Saurenergy As part of the initiative for achieving a 100% Renwable Energy Powered Varanasi City, SECI hereby invites tenders for setting up of 275 MW Grid connected Solar PV Projects in Uttar Pradesh Solar Park under NSM Phase-II, Batch-IV, Tranche-XIII. The RfS document is available on the SECI as well as TCIL website, www.tcil-india-electronictender.com. Prospective bidders […] Read more
ReneSola Connects 90MW of Distributed Generation Projects in China Updated On Wed, Jan 3rd, 2018 by Saurenergy ReneSola’s rooftop project business in China continues to gain traction, and remains optimistic about the opportunities ahead. ReneSola Ltd, a leading solar project developer and operator has announced that it connected over 90MW of rooftop projects in China in the second half of 2017. It intends to hold over 70MW of these projects and provided […] Read more
Tata Power Renewable Energy Commissions 50 MW Solar Plant in Karnataka Updated On Wed, Jan 3rd, 2018 by Saurenergy The 50 MW solar plants have been built over 253 acres. Sale of power from solar plant has been tied up under a 25-year Power Purchase Agreement with NTPC Ltd. at a tariff of Rs. 4.84/ unit. Tata Power Renewable Energy Ltd. (TPREL), India’s largest renewable energy company has commissioned its 50 MW DCR solar […] Read more
Transition Toward LED Light bulb Helps Southern Railway Save Energy Updated On Tue, Jan 2nd, 2018 by Saurenergy Between April and November, the Chennai division generated Rs 1,307 crore revenue, against the Rs 1,240 crore generated during the corresponding period in 2016. Southern Railway managed to save 741 MW (megawatt) exponent between April and November as a result of switching to LED light. In a statement, Southern Railway said that as region of […] Read more