EOI FOR THE EMPANELMENT OF RECRUITMENT AGENCIES FOR THE RECRUITMENT SERVICES AT SECI Updated On Wed, Mar 28th, 2018 by Saurenergy Expression of Interest (EOI) from the Recruitment Agencies for the Empanelment for Recruitment Services at Solar Energy Corporation of India Limited. This has reference to the EOI documents (EOI No. SECI/C&P/ORA/2017/15 dated 28.03.2018) for “the Expression of Interest (EOI) from the Recruitment Agencies for the Empanelment for Recruitment Services at Solar Energy Corporation of India […] Read more
World’s First Solar Fuels Reactor for Night Passes Test Updated On Wed, Mar 28th, 2018 by Saurenergy International solar thermal energy researchers have successfully tested CONTISOL, a solar reactor that runs on air, able to make any solar fuel like hydrogen and to run day or night – because it uses concentrated solar power (CSP) which can include thermal energy storage. The promise of solar fuels is that we could have zero […] Read more
Climbing Stairs: for Indian Rooftop Industry Updated On Tue, Mar 27th, 2018 by Saurenergy India has diligently stepped-forward to ply across the cross roads of innovation. Today, India houses one of the biggest tech companies in the world has turned heads. But still, to all the innovations, India has been prolonging on the growing power demands. Not scathing 100 GigaWatt(GW) rather democratized dialogue on 40GW of rooftop seems to […] Read more
RESULTS OF E-BIDDING AND E-RA FOR 2000 MW ISTS-CONNECTED WIND POWER PROJECTS (TRANCHE-III) Updated On Tue, Mar 27th, 2018 by Saurenergy /web-data/docs/SECI%20Wind%202000%20MW%20result%20website%20upload.pdf Read more
POSTPONEMENT OF THE TENDER UPLOADING : SELECTION OF SOLAR POWER DEVELOPERS FOR SETTING UP OF 100MW (50MW X 2) GRID CONNECTED FLO Updated On Mon, Mar 26th, 2018 by Saurenergy This has reference to the NIT No. SECI/C&P/SPD/RfS/100MW FLOATING/UP/032018 published dated 16.03.2018 regarding the RfS Selection of Solar Power Developers for Setting up of 100MW (50MW x 2) Grid Connected Floating Solar Power Projects to be installed at Rihand Dam (also known as Govind Ballabh Pant Sagar Reservoir), Sonbhadra District, Uttar Pradesh. The RfS documents […] Read more
MNRE to set up 65,180 biogas plants in current year under the National Biogas and Manure Management Programme (NBMMP) Updated On Thu, Mar 22nd, 2018 by Saurenergy About 49.6 lakh household size biogas plants already installed under the programme The National Biogas and Manure Management Programme (NBMMP) aims at setting up of family type biogas plants for providing biogas as clean cooking fuel and a source of lighting. The slurry produced from biogas plants as a by-product is an organic bio-manure for […] Read more
Government making efforts to reduce dependence on traditional biomass cooking Updated On Thu, Mar 22nd, 2018 by Saurenergy 36,940 family type and 849 community type improved cook stoves distributed under the Unnat Chulha Abhiyan About 7.05 lakh solar cookers distributed/sold through the State Governments 3.45 crore LPG connection given under Pradhan Mantri Ujjwala Yojana As per Census 2011, about 65.9 per cent of households depend on solid biomass, including firewood, crop residue and […] Read more
Policy measures for promotion of new & renewable energy Updated On Thu, Mar 15th, 2018 by Saurenergy Total capacity of 65 GW renewable energy installed in the country so far The Government of India has undertaken a number of policy measures for increasing share of renewable energy in India’s energy mix. These, inter-alia, include: a) Provision of Renewable Purchase Obligation (RPO) under the National Tariff Policy; b) Notification of the long term […] Read more
KUSUM Scheme – harnessing solar power for rural India Updated On Thu, Mar 15th, 2018 by Saurenergy Solar water pumps to be installed in remote areas for irrigation needs Farmers can get extra income by selling surplus solar power to DISCOMs The Government of India is in the process of formulating a Scheme ‘Kisan Urja Suraksha evam Utthaan Mahabhiyan (KUSUM)’ which, inter alia, provides for: (i) installation of grid-connected solar power plants […] Read more