Author: Saur News Bureau

SITE VISIT FOR 160 MW WIND AND SOLAR HYBRID PROJECT

In reference of EOI submitted for 160 MW Wind and Solar Hybrid project.The interested vendors shall have site visit on 21/02/2018 and 22/02/2018. The detail site address given below – 160 MW proposed Wind and Solar Hybrid project Near APSRTC 10 MW Wind farm, VGML CROSS, N.S Gate. RAMAGIRI RAMAGIRI Taluk, Ananthpur District (AP-515101) Please […]

Read more

REQUEST FOR SELECTION (RFS) DOCUMENT FOR 750 MW GRID CONNECTED SOLAR PHOTO VOLTAIC POWER PROJECTS UNDER NSM PHASE II BATCH-IV TR

REQUEST FOR SELECTION (RfS) DOCUMENT FOR 750 MW GRID CONNECTED SOLAR PHOTO VOLTAIC POWER PROJECTS UNDER NSM PHASE II BATCH-IV TRANCHE-XV IN KADAPA SOLAR PARK, ANDHRA PRADESH The extension of prebid meeting and bid submission schedule for 750 MW Grid connected solar Photo voltaic power project under NSM Phase II Batch 4 has been uploaed […]

Read more

Mining Clean Energy That Looks To Our Future Demands

The goals of Paris climate Agreement was discussed when all the eminent representatives across the globe met at a meeting in Bonn in November 2017. The major challenging point of discussion revolved around rapid scaling up the deployment of renewable energy, mitigating the fossil fuel use in the meantime. The major aspect is still at […]

Read more

Viz-A-Viz with Neelesh Garg, Director | Saatvik Green Energy

SOLAR MARKET HAS A LOT OF SCOPE IN INDIA Saatvik Green Energy is on a mission to lead the global transition to renewable energy in India. Having established its manufacturing facility in the state of Haryana, Saatvik actively supports the initiatives to provide clean sources of energy, by manufacturing and distributing world class solar photovoltaic […]

Read more

MECA HYPERION-SR Horizontal Tracker

Product Brief: Meca Solar has launched ‘Hyperion-SR,’ which is touted to be the most advanced single row horizontal tracker on the market. It is designed to increase the PV power plant output up to 27% compared to ground-mounted fixed structure systems. Product Feature:  It is equipped with the minimum number of piles per MW, self-powered […]

Read more

Dealing With Cracks in India’s Solar Dreams

In a first of its kind study in India, scientists from Indian Institute of Technology Bombay (IITB) and National Institute of Solar Energy, New Delhi, conducted a detailed survey at 51 locations across India to check for the degradation in the performance of photovoltaic modules. This study, to establish reliability of the modules, could help […]

Read more

Why a Performance Guarantee is Guaranteed Underperformance

Sorrebh Samdani, Applications Engineering Manager at infiswift Many in the solar industry view the performance guarantee as an assurance that PV projects will produce the maximum amount of energy. While the performance guarantee does ensure that a PV project will produce above a minimum threshold, it does not ensure that it will perform to its […]

Read more

The Dark Truth of QCA: Who is Paying Whose Penalty?

By Abhk Kumar Das, Del2infinity Energy Consulting The solar and wind power generation shows a promising future in India. But due to the variability and intermittency, large scale renewable energy penetration in existing grid is a challenge and the proper policy and regulatory mechanisms, technological solutions and institutional structures are key issues in solar and […]

Read more
      SUBSCRIBE NEWS LETTER
Scroll