Madhya Pradesh Regulator is Right, Don’t Consider Any Change in PPAs Updated On Sat, Feb 23rd, 2019 by Saurenergy The news that the Madhya Pradesh Electricity Regulatory Commission (MPERC) has refused the plea from the state electricity distribution companies’ (discoms) to revise the rates at which they procure wind power is to be welcomed. The MP Power management company — the holding entity of the state’s discoms, had made a plea to review the […] Read more
MBJ Post Shipment and Post Installation Inspection Report Updated On Thu, Feb 21st, 2019 by Saurenergy In order to realize the module test on site at the highest technical level, MBJ and there worldwide partners need the right testing equipment. MBJ invented and consistently improved the Mobile PV Laboratory for the efficient on-site testing of solar modules, so that today it works on the technical level of conventional stationary laboratories. Test […] Read more
STATUS OF RFS : IMPLEMENTATION OF 97.5MW GRID CONNECTED ROOFTOP SOLAR PV SYSTEM SCHEME FOR GOVERNMENT BUILDINGS IN DIFFERENT STATES/ UNION TERRITORIES OF INDIA UNDER CAPEX/ RESCO MODEL Updated On Thu, Feb 21st, 2019 by Saurenergy This has reference to the NIT No. SECI/C&P/NIT/MNRE/97.5MW GCRT/IND/022019 regarding the Tender for Implementation of 97.5MW Grid Connected Rooftop Solar PV System Scheme for Government Buildings in different States/ Union Territories of India under CAPEX/ RESCO Model under Global Competitive Bidding. The detailed tender document are under preparation and shall be available for downloading from […] Read more
PRE-BID MEETING NOTIFICATION FOR 50 MW THDC SOLAR POWER PLANT AT KASAGOD KERALA Updated On Thu, Feb 21st, 2019 by Saurenergy Pre-Bid Meeting Notification: Tender for Design, Engineering, Procurement, Supply, Construction, Erection, Testing & Commissioning of 50 MW (AC)Solar PV Power Plant including 10 years Plant O&M at KASARGOD, KERALA, India This has reference to the NIT documents (NIT No. SECI/C&P/NIT/2019/THDC50 dated 08.02.2019) regarding the Tender for Design, Engineering, Procurement, Supply, Construction, Erection, Testing & Commissioning of […] Read more
Modi Cabinet Approves 25.7 GW Solar Scheme to Benefit Farmers Updated On Thu, Feb 21st, 2019 by Saurenergy In another move that is deadlined 2022, or in time to help the country meet its 100 GW target for solar, the government approved a major scheme to get farmers involved. The KUSUM (Kisan Urja Suraksha evam Utthaan Mahabhiyan) scheme has been in the works for some time and seeks to provide both financial security […] Read more
Company Feature – SolarMaxx Updated On Wed, Feb 20th, 2019 by Saurenergy Introduction 1. About us SolarMaxx, established in 2008, is a leading manufacturer and supplier of high efficiency Solar PV Modules suitable for Solar power plants of utility as well as rooftop scale. SolarMaxx is a proud leader in its regional market of Rajasthan and is rapidly expand across India. Creating and delivering clean energy, cost-effective […] Read more
PRE-BID MEETING NOTIFICATION: TENDER FOR 20 MW (AC) FLOATING SOLAR PV POWER PLANT WITH 60 MWH BESS AT UNION TERRITORY, LAKSHADWEEP, INDIA Updated On Wed, Feb 20th, 2019 by Saurenergy Pre-Bid Meeting Notification: Tender for Design, Engineering, Supply, Construction, Erection, Testing & Commissioning of 20 MW (AC) Floating Solar PV Power Plant with 60 MWh BESS including 10 years Plant O&M at Union Territory, Lakshadweep, India This has reference to the NIT documents (NIT No. SECI/C&P/NIT/2019/LKRE dated 18.02.2019) regarding the Tender for Design, Engineering, Supply, Construction, […] Read more
China Plans to Launch a Space-Based Solar Power Station by 2025 Updated On Tue, Feb 19th, 2019 by Saurenergy According to China’s Science and Technology Daily, the country’s researchers are working on a solar power station they will send to outer space. China’s Academy of Space Technology is working on an orbital power plant that would capture solar energy in space and beam it back to Earth. The scientists in Chongqing, China have plans […] Read more
Review of a PV Plant Featuring Single-Axis Trackers Updated On Tue, Feb 19th, 2019 by Saurenergy Soltec, a leading manufacturer and supplier of single-axis solar trackers and related services in large-scale projects, supplied 162 MW of complete tracker equipment to a PV power plant located in Northeast Brazil. The project counts with 5,368 units of the innovative independent-row tracker. Eliminating array-gaps at all pile mounting locations, SF7 achieves complete tracker module […] Read more